My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
121818
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 2:12:32 PM
Creation date
12/12/2018 2:12:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/18/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
team members per shift is five (5). Four(4) of the team members (Haz-Mat Captain, Engineer, <br /> Firefighter/Paramedic and Firefighter) are assigned to the designated Haz-Mat station. The fifth <br /> team member, determined by department-Department seniority, is not rank specific and may be <br /> assigned to the Haz-Mat station based on organizational need using the bid process whenever <br /> possible. <br /> B. Effective September 1, 2012 the The four (4) team member positions (Haz-Mat Captain, <br /> Engineer, Firefighter/Paramedic, and Firefighter)at the designated Haz-Mat Station will only be <br /> available-to-be-filled and back-filled by Haz-Mat Team members or individuals holding the <br /> appropriate Haz-Mat certification. <br /> than-June-3072044:Procedures regarding staffing, assignments, training, withdrawal and other Haz-Mat <br /> specific topics Beare included in the Department's Haz-Mat program policy. <br /> 31.2 Compensation <br /> Personnel assigned to the Hazardous Materials Response Team will be compensated at five percent (5%) <br /> above their respective base rates of pay, subject to MOU Section 5.1. <br /> 31.3 Withdrawal Process <br /> A Haz-Mat team member as defined in Section 31.1 shall be permitted to withdrawal from the Haz-Mat <br /> program . • - - • . -' • ollowing one (1) year of Haz-Mat service and with the approval of <br /> the Fire Chief. The-wWithdrawal : : -: . - . . •- . - - • ' - :from the Haz-Mat program is governed <br /> by the Department's Haz-Mat program Policy policy. ' _ .• •- • - <br /> 1 <br /> Section 32. Separability of Provisions <br /> I^ the o nt tha*Should any provisions of this , . - • . - - . • . _ . : _ • MOU be declared <br /> rendered unlawful or unenforceable by any subsequent legislative enactment, state regulation or by a <br /> court of competent jurisdiction : .• ' . . - . . : •, •my that provision of the <br /> Under-standi-ngMOU shall be null and void, . . . . ' . . • ., . . , <br /> - •. - - - . - - - _, . . • . • • . . . d all other provisions of the MOU <br /> shall not be affected and shall remain in full force and effect. <br /> Section 33. Existing Memorandum of Understanding <br /> This . . - •• . .,-: . •• .. _ -: • :, :'•:MOU shall supersede all existing Mmemoranda of Uunderstanding <br /> between the Department JPA and the Union .,•. : • ' . - ,•- : • ••• . <br /> conditions for those-employees represented by the IAFF, Local 1974, Union for the period July 1, 2014 <br /> 2018 through June-39December 31,20182021. <br /> 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.