My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
121818
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 1:47:49 PM
Creation date
12/12/2018 1:47:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/18/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Express Bus Service. In addition to these projects, the TVTC has approved 11 <br /> additional projects which includes the El Charro Road extension in Pleasanton. <br /> Approximate project completion date: 2021 <br /> Project cost: $1,043,519 <br /> % funded by development impact fees: 100% <br /> Source of funding: Tri-Valley Transportation Development Fee <br /> Downtown Parking-In-Lieu Fund (104) <br /> Amount collected in previous fiscal years subject to 5 year limitation: $10 <br /> Funds are committed to the following project: <br /> • Expand Parking on Downtown Transportation Corridor project#17448 <br /> Description: This project will design and construct a public parking lot on the <br /> transportation corridor between Bernal Avenue and Abbie Street. The project will <br /> replace an existing stabilized gravel parking lot that has a one-way drive isle and <br /> diagonal parking. The new parking lot will be similar to the Firehouse Arts Center <br /> parking lot with a two-way drive isle, ninety-degree parking on each side, walk <br /> path and landscaping. The project will require a 5-to-6-foot retaining wall be built <br /> along the west edge of the railroad corridor, drainage improvements, stormwater <br /> treatment facilities, curb, gutter, new asphalt and striping. <br /> Approximate project completion date: 2020 <br /> Project cost: $2.2 million <br /> % funded by development impact fees: 30% <br /> Source of funding: Downtown Parking In-Lieu and General Fund CIP <br /> Lower Income Housing Fund (Fund 122) <br /> Amount collected in previous fiscal years subject to 5 year limitation: $0 <br /> Funds are 100% expended as accounted for in Attachment 2. <br /> Water and Sewer Expansion Funds (Funds 422 and 432) —These funds are utilized to <br /> account for Water and Sewer Connection fees. When a project serves both new and <br /> existing development, only the portion related to new development is charged against <br /> these funds. The other portions of the project are funded by other sources, such as <br /> revenue from the rate payer funded Repair and Replacement Funds (Replacement <br /> Funds). The Replacement Funds are accounted for separately (Funds 422 and 432). <br /> Fund balance, revenues, expenditures and transfers for Funds 422 and 432 for fiscal <br /> years 2013/14 through 2017/18 are detailed in Attachment 3. <br /> The following is a summary by fund of the projects that the City is committed to <br /> complete in coming years with available Water and Sewer Connection fees: <br /> Water Expansion Fund (422) <br /> • Nevada Street Water Main Extension — project#94115 <br /> Description: Installation of a 16' water transmission line from Stanley Boulevard to <br /> Zone 7 Water Turnout No. 5 at Bernal Avenue. <br /> Approximate project completion date: 2019 <br /> Project cost: $606,000 <br /> % funded by development impact fees: 35.6% <br /> Source of funding: Water Connection Fees (35.6%); Water Replacement Funds <br /> (64.4%) <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.