My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
121818
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 1:39:20 PM
Creation date
12/12/2018 1:39:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/18/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> GeoTech <br /> u ILfTY LOCATING 460 Center Street#6873 Moraga, Ca 94570 Ph:510-235-4144 info@geotechlocating.com <br /> QUOTATION FOR <br /> MIG QUOTATION <br /> RICHARD LARSON <br /> 800 HEARST AVE Date Quotation <br /> BERKELEY,CA 94710 <br /> 11/23/2018 5455 <br /> Description RATE <br /> EXCLUDES: <br /> •Non conductive force main lines without tracer wire visible in the project area <br /> •Fiber optic lines without tracer wire visible in the project area. <br /> •Sanitary or storm drain lines without access in the project area. <br /> •Transite or plastic water lines without tracer wire visible near the project area. <br /> •Locating inside the buildings not included. <br /> RESULT PRESENTATION: <br /> Utilities will be marked with spray paint using the American Public Works Association color code. <br /> •Electric ------------- Red <br /> •Telephone/Comm-----Orange <br /> • Storm/Sanitary --------Green <br /> • Water/Air -----------Blue <br /> •Gas/Steam/Oil--------Yellow <br /> •Unknown pipes --------Pink <br /> PRICE: 4,950.00 <br /> Work as outlined above includes equipment,travel costs and personnel and is offered for the sum of: <br /> ACAD PRESENTATION: 3,950.00 <br /> Utility marks will be collected with total station and plotted onto a drawing provided by client,by layers, <br /> in the ACAD format. Unless two site control points and their coordinate values are provided,the utilities <br /> will be plotted on an arbitrary coordinates system referencing a minimum of two prominent building <br /> corners or other features. This will enable insertion into other drawings by the client. <br /> SIGNATURE: Page 2 Total $8,900.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.