My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
120418
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2018 3:33:55 PM
Creation date
11/27/2018 2:58:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/4/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JKAARCHITECTURE <br /> October 15, 2018 <br /> Steve Kirkpatrick <br /> City Engineer <br /> City of Pleasanton <br /> 123 Main Street <br /> Pleasanton, California 94566 <br /> RE: Architectural Services— Pleasanton Library Remodel <br /> Dear Steve, <br /> Now that the schematic design proposed has been accepted, I am pleased to offer this <br /> proposal for construction document and construction administration services for the design <br /> of the Pleasanton Library Remodel project. This proposal is based on the approved <br /> schematic design and includes Design Development, Construction Documents, Bidding and <br /> Construction Administration services. It is assumed that the project will be developed using <br /> a standard design-bid-build approach. <br /> I have based this proposal on the preliminary requirement to design the project for the <br /> modifications to the existing office areas to create usable office space for the combined <br /> Library/Community Services department. The scope will include a roughly 2,500 SF <br /> remodel of the existing library admin space to accommodate the new office needs. The <br /> estimated construction budget for the project is approximately$1,200,000 and will be further <br /> refined as the design develops. <br /> Please note that this proposal is based on the scope of services that we believe is necessary <br /> to successfully complete this project. If there are scope items that are not included, or that <br /> are not necessary, we would be pleased to adjust the scope and fee to meet your needs. <br /> We are proposing to offer the following scope of services: <br /> DESIGN DEVELOPMENT PHASE <br /> + Refine design of Floor Plans to include laying out equipment and furniture to insure <br /> proper fit. <br /> + Develop designs for temp storage units, including fagade improvements, lighting and <br /> HVAC. <br /> + Develop building mechanical, plumbing and electrical plans. <br /> + Coordinate with Owner systems for phone/data/cable requirements. <br /> 280 Bettencourt Street, Sonoma, CA 95476 <br /> www jeffkatzarchitecture.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.