My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
120418
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2018 2:52:31 PM
Creation date
11/27/2018 2:20:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/4/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACTIVITY QTY RATE AMOUNT <br /> DIR#1000008376 <br /> By signing below you acknowledge and agree to our Contract. SUBTOTAL 145,286.00 <br /> The values shown above represent a specific scope; no other <br /> work should be assumed unless specifically noted in the text of TAX 9,711.67 <br /> the above line items. Unless otherwise specified above we SHIPPING 5,000.33 <br /> Exclude Responsibility for: offloading equipment, removal of <br /> packaging, project security, landscape&hardscape repair, <br /> delays due to conflicts, removal of spoils, locating underground; <br /> utilities, pipes, obstructions, conditions unforeseen and/or not <br /> disclosed at time of estimate, permits, engineering, soil <br /> samples. We are experienced with State& Federal prevailing <br /> wage and certified payroll requirements from DIR/DOL and will <br /> process when applicable. Union Agreements, including PLA's, <br /> are the responsibility of others and not to be included in our <br /> contract. Conditions: Grades; stable,compacted, &workable, <br /> (rough grade to be taken +or-one tenth of one inch), <br /> adequate access to work site provided for workmen, materials, <br /> tools, &equipment. <br /> TOTAL $159,998.00 <br /> Accepted By Accepted Date <br /> Estimate good for 90 Days. Payment <br /> Terms: Material balance due on delivery/ Installation balance due upon completion of project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.