Laserfiche WebLink
Hybrid IA from the Triangle Study <br /> 1. 580 WB HOV/HOT lane and ramp metering- E. of Greenville to W.of Foothill <br /> 2. 580 WB auxiliary lane -First to Isabel, (includes structure widening at creeks) <br /> 3. 680 ramp metering <br /> 4. 580 EB climbing lane <br /> 5. 580/680 interchange improvements- WB to SB, Phase I <br /> 6. 580 EB Phase I -Aux lanes - Isabel to First <br /> 7. SR 84 widening-Pigeon Pass to 680 plus 680 SB aux lane from SR 84 to <br /> Andrade,plus 680 NB HOV/HOT Lane from Alameda Creek to SR 84 <br /> 8. 680 NB HOV/HOT lane - SR 84 to Alcosta <br /> 9. 680 SB HOV/HOT lane-Alcosta to SR 84 <br /> 10. 580/680 direct connector- WB to SB. Phase 2 <br /> 11. 580 EB - Phase 2 - Mixed-flow lanes- Santa Rita to Vasco <br /> 12. 580 EB HOV/HOT lane -Foothill to Hacienda <br /> BART R/W protection on 580(order independent of the others) <br /> Upon construction of the Phase I improvements in Pleasanton, each member agency will <br /> support item 7 from Hybrid I A which includes the construction of State Route 84 as a 4 <br /> lane facility between Pigeon Pass and Interstate 680, including ramp improvements at the <br /> Route 84/1-680 interchange, and construction of a southbound auxiliary lane on [-680 <br /> from Route 84 to Andrade Road. This configuration is part of the ultimate configuration <br /> which will include six lanes from 1-580 to Stanley Boulevard and four lanes from Stanley <br /> Boulevard to 1-680. <br /> CITY OF DUBLIN CITY OF LIVERMORE <br /> nil 4+ b/.r�.„.-a-- -10 <br /> Mayor I)ate Mayor Date <br /> Attest: Attest: <br /> City Clerk City Clerk <br /> CITY OF PLEASANTON COUNTY OF ALAMEDA <br /> Mayor Date Supervisor Date <br /> Attest: Attest: <br /> City Clerk Clerk of the Board <br />