Laserfiche WebLink
THE CITY OF Attachment 2 <br /> U mime <br /> LE ASANTO c <br /> November 3, 2017 <br /> Mr. Brian Wines <br /> San Francisco Bay Regional Water Quality Control Board <br /> 1515 Clay Street, Suite 1400 <br /> Oakland, CA 94612 <br /> Subject: City of Pleasanton,Lions Wayside and Delucchi Parks Master Plan Project, <br /> USACE File Number 2013-283,CIWQS Place Identification 818840, Lake or Streambed <br /> Alteration Notification Number 1600-2015-0373-R3 <br /> Dear Mr. Wines: <br /> This letter is a follow-up to our phone conversation on September 13, 2017,and an earlier email <br /> dated August 17, 2017 to Kristin Asmus(AECOM), in which you posed questions about the <br /> City's latest concept plan for Lions Wayside Park, which we submitted to you on and the other <br /> responsible agencies (U.S. Army Corps of Engineers and California Department of Fish and <br /> Wildlife)on August 16 (see attached).This revised concept plan would substantially reduce the <br /> impacts to the stretch of Kottinger Creek in Lions Wayside Park compared to the previously- <br /> submitted plans which were part of the City's initial permit application. In particular, the revised <br /> plan would result in the following environmental improvements over the initial plan: <br /> • Impacts to the creek would be reduced by approximately 500 linear feet; <br /> • Creek fill would be reduced by 2,900 cubic yards; <br /> • Tree removal would be reduced from 19 trees to 8 trees; and <br /> • Creek/riparian enhancement would occur on the approximately 400 feet of creek that <br /> would remain open channel. <br /> Responses to your questions are provided below. We hope that the answers to these questions <br /> will allow you to discuss the viability of this alternative with your colleagues at the Regional <br /> Water Quality Control Board. If you believe this alternative could achieve permitting objectives, <br /> we would provide more detailed plans and revise our permitting application accordingly. <br /> I. Has the City looked into decking materials that would allow sunlight to reach the creek <br /> channel? <br /> Yes. To reduce environmental impacts, the City proposes to undertake the following best <br /> practices to build the decking connecting the proposed bandstand to the remainder of <br /> Lions Wayside Park: <br /> • The deck will be built of grated decking with openings that allow light to pass <br /> through. The City is currently exploring multiple options, including products <br />