My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
100218
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2018 4:18:30 PM
Creation date
9/27/2018 10:59:31 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/2/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> City of Pleasanton <br /> Three Tank Rehab Cost Proposal <br /> Project Number: Engineering Design Services for the Three Tank Rehab Project <br /> 6 <br /> _ QQii <br /> W c J o D U N e� <br /> ._ J - - H 0 N LL. > > <br /> 0, Yn <br /> a a c J t "' Q c c <br /> TASKS a v (.A vi -` a O' 6 U <br /> TK LS DC CP MI ER <br /> No. Fully Loaded Rates $280.00 $260.00 $230.00 $160.00 $130.00 $130.00 <br /> 1 Project Management 0 $0 <br /> 1.1 Project Management,Coordination,and Oversight 8 24 12 44 $9,320 <br /> 1.2 Project Meetings 12 12 24 $6,120 <br /> 2 Preliminary Investigations 0 $0 <br /> 2.1 Corrosion Engineering 0 $30,964 $30,964 <br /> 2.2 Coating Tests 0 $925 $925 <br /> 2.3 Electrical Systems Review 6 6 12 $1,480 $4,540 <br /> 3 Engineering Design Services 0 $0 <br /> 3.1 65%Design Submittal 8 32 75 100 4 219 $1,000 $10,570 $46,690 <br /> 3.2 100%Design Submittal 4 24 50 80 4 162 $3,225 $28,785 <br /> 3.3 Final"Issue for Bid"Construction Documents 2 , 16 24 36 4 82 $1,075 $14,355 <br /> 3.4 QA/QC 30 30 $7,800 <br /> 4 Bid Phase Services 0 $0 <br /> 4.1 Engineering Services During Bid 8 , 16 4 28 $2,360 $3,399 $12,199 <br /> 0 $0 <br /> O $0, <br /> 0 $0 <br /> O $0 <br /> O $0 <br /> O $0 <br /> 0 $0 <br /> Other Direct Costs $507f $400 $137 $537 <br /> Subtotal-Hours 48 30 130 149 216 28 801 <br /> Quincy Labor Cost $13,440 $7,800, $29,900 $23,840 $28,080 $3,640 $106,700 • $106,700 <br /> Subconsultant Total Cost $1,925 $19,110 $34,500 $55,535 <br /> Fixed Fee on ODCs(10%) $51 $51 <br /> Fixed Fee on Subconsultants(5%) $96 $956 $1,725 $2,777 <br /> Total Cost $558 $2,021 $20,066 $36,225 $165,570 <br /> Cast and Budget Sheet Three Tank PS&E Project 1 Firs 9/112018 <br /> Quincy Engineering,Inc. <br />