Laserfiche WebLink
1. General Electrical Materials <br /> 2. Conduit and Boxes <br /> 3. Low Voltage Wire <br /> 4. Grounding <br /> 5. PLC an Operator Interface Applications Programming <br /> 6. Instrumentation (flowmeters, pressure transmitters, etc) <br /> 7. Other electrical components. <br /> F. Electrical and Instrumentation construction cost estimate at each design <br /> deliverable. <br /> G. Bid services and addenda. <br /> Assumptions <br /> • We have assumed one design bid package, for one site, one project for construction. <br /> • Our standard insurance coverage limits for general liability and E&O liability at $2,000,000 <br /> per occurrence and $2,000,000 aggregate are sufficient. <br /> • Drawings and specifications can be completed by using our standards and templates <br /> created in AutoCad and MS Word using CSI format. <br /> • Drawings furnished to Frisch Engineering from the existing O&M manuals and designs are <br /> accurate. Inaccuracies may cause additional time and effort in sorting it out during design. <br /> • The project construction budget includes an industry standard 10% minimum contingency <br /> such that changes can be designed and implemented as deemed necessary by the <br /> Engineer or Owner during construction. This quotation does not include cost for <br /> construction changes regardless of initiating source. <br /> • This quotation does not include Arc-Flash analysis (unless specifically stated) as required by <br /> the NFPA 70 electrical code. That analysis and associated equipment labeling can be <br /> provided for an additional fee. <br /> • Electronic files (ACAD) for the siteplan, mechanical and building plan will be provided to us <br /> for our use as background files. If electronic files need to be generated for the site plan, <br /> additional charges may apply. <br /> • Rate escalation of 5% per hour is scheduled for January 1, 2019 and each anniversary <br /> thereafter. Escalated rates will only apply to extra work performed after January 1, 2019. <br /> • Hourly rates include overhead costs such as telephone, photocopies, computer costs, and <br /> insurance. <br /> • Hourly rates do not include expenses such as mileage, rental equipment, airline tickets, <br /> rental vehicles, lodging, non-incidental photocopying and materials. <br /> o Travel time will be billed at hourly rate, plus current Federal mileage rate. <br /> o Per diem charge will be added based on half or full day of field work. <br /> o Actual travel expenses (airfare, ground transportation lodging, etc.) are billed at cost <br /> plus 10% for overhead and handling. <br /> Pleasanton Ruby Hill Frisch 1.doc 2 of 3 page(s) 8/17/2018 <br />