My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
090418
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 2:23:28 PM
Creation date
8/24/2018 4:14:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/4/2018
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Development Impact Fee Nexus Study <br /> Draft Appendix A 07/12/18 <br /> ATTACHMENT 1 <br /> EXISTING CONDITIONS <br /> INTERSECTION LEVELS OF SERVICE <br /> Project Intersection Control Delay' LOS2 <br /> Number <br /> W Las Positas Boulevard Signalized 12 B <br /> &Owens Drive <br /> 25 <br /> W Las Positas Boulevard Signalized 28 C <br /> &Santa Rita Road <br /> 26 New Roadway <br /> 27 Stoneridge Mall Road Signalized 19 B <br /> &Embarcadero Court <br /> Fallon Road <br /> &1580 WB Off-Ramp Signalized 7 A <br /> 28 <br /> El Charro Road <br /> &1580 EB Off-Ramp Signalized 6 A <br /> Hacienda Drive <br /> 29 Signalized 14 B <br /> &1580 EB Off-Ramp <br /> Hopyard Road <br /> 30 Signalized 24 C <br /> &I 580 EB Off-Ramp <br /> 31 Hopyard Road Signalized 11 B <br /> &1580 WB Off-Ramp <br /> 32 Stoneridge Drive Signalized 9 A <br /> &1-680 NB Off-Ramp <br /> Valley Avenue <br /> 33 &Koll Center Parkway(N) Signalized 21 C <br /> Stoneridge Drive Signalized 9 A <br /> &1-680 NB Off-Ramp <br /> 34 <br /> Stoneridge Drive Signalized 36 D <br /> &Johnson Drive <br /> Stoneridge Drive <br /> 35 &Stoneridge Mall Road Signalized 24 C <br /> Note:Bold indicates unacceptable intersection operations. <br /> 1.Average control delay in seconds per vehicle;Delay calculation performed using HCM 2000 methodologies <br /> 2.LOS= Level of Service per HCM 2000 methodologies <br /> 3. Delay and LOS reported for the overall intersection (worst approach in parentheses). <br /> Source:Fehr&Peers,2016. <br /> Economic& Planning Systems, Inc. A-9 P:\151000s\151111PleasantonFeelReport1151111_FeeNexus_071218.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.