Laserfiche WebLink
Contents <br /> Table 18-1.Alternatives to Mitigate the Dam Failure Hazard 18-2 <br /> Table 18-2.Alternatives to Mitigate the Drought Hazard 18-3 <br /> Table 18-3.Alternatives to Mitigate the Earthquake Hazard 18-4 <br /> Table 18-4.Alternatives to Mitigate the Flooding Hazard 18-5 <br /> Table 18-5.Alternatives to Mitigate the Landslide Hazard 18-6 <br /> Table 18-6.Alternatives to Mitigate the Severe Weather Hazard 18-7 <br /> Table 18-7.Alternatives to Mitigate the Wildfire Hazard 18-8 <br /> Table 19-1.Action Plan 19-2 <br /> Table 19-2.Prioritization of Area-Wide Mitigation Actions 19-3 <br /> Table 19-3.Analysis of Mitigation Actions 19-4 <br /> Table 19-4.Plan Maintenance Matrix 19-6 <br /> Figures <br /> Figure 3-1.Hazard Mitigation Survey 3-7 <br /> Figure 3-2.Dublin Farmer's Market 3-8 <br /> Figure 3-3.Pleasanton Farmers Market 3-8 <br /> Figure 3-4.A Resident Receives a Risk Assessment 3-8 <br /> Figure 3-5.Example"Workstation"Report 3-8 <br /> Figure 3-6.Hazard Mitigation Plan Web Site Homepage 3-9 <br /> Figure 4-1. Planning Area 4-2 <br /> Figure 4-2.Watersheds and Water Bodies in the Planning Area 4-5 <br /> Figure 4-3. Critical Facilities 4-8 <br /> Figure 4-4. Critical Infrastructure 4-9 <br /> Figure 4-5.Residential Building Permit Trends,2005 to 2014 4-10 <br /> Figure 4-6. Alameda County vs.Planning Area Population Growth 4-12 <br /> Figure 4-7.Planning Area Age Distribution 4-13 <br /> Figure 4-8.Planning Area Race Distribution 4-14 <br /> Figure 4-9. Industry in the Planning Area by Population Employed 4-15 <br /> Figure 4-10.Occupations in the Planning Area 4-16 <br /> Figure 4-11.California State and Planning Area Unemployment Rate 4-17 <br /> Figure 7-1.Palmer Crop Moisture Index for Week Ending May 20,2017 7-3 <br /> Figure 7-2.Palmer Z Index(April 2017) 7-3 <br /> Figure 7-3.Palmer Drought Index through May 20,2017 7-4 <br /> Figure 7-4.Palmer Hydrological Drought Index through May 20,2017 7-4 <br /> Figure 7-5. 12-Month Standardized Precipitation Index(May 1,2016-April 30,2017) 7-5 <br /> Figure 7-6.Zone 7 Water Agency Supply and Use 7-6 <br /> Figure 8-1.Peak Acceleration(%g)with 10%Probability of Exceedance in 50 Years 8-4 <br /> Figure 8-2. Calaveras Fault M7.0 Earthquake Scenario Peak Ground Acceleration 8-6 <br /> Figure 8-3. Greenville Fault M7.0 Earthquake Scenario Peak Ground Acceleration 8-7 <br /> Figure 8-4. Haywired Fault M7.05 Earthquake Scenario Peak Ground Acceleration 8-8 <br /> Figure 8-5.Mount Diablo Fault M6.7 Earthquake Scenario Peak Ground Acceleration 8-9 <br /> Figure 8-6.N. San Andreas Fault M7.8 Earthquake Scenario Peak Ground Acceleration 8-10 <br /> Figure 8-7.Recent Earthquakes Near Planning Area 8-12 <br /> Figure 8-8. Significant Known Faults in the Bay Area 8-14 <br /> TETRA TECH <br /> xv <br />