My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
071718
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 10:11:31 AM
Creation date
7/11/2018 10:11:28 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/17/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> SCOPE OF WORK <br /> (To be used in conjunction with <br /> the City Standard Specifications and Standard Details, and <br /> the State Standard Specifications and Standard Plans) <br /> All work shall be in accordance with the City of Pleasanton Standard Specifications and <br /> Details dated November 2016. <br /> All work not specifically called out as "Extra Work" or "Weed Abatement Work" in the <br /> below scope of work sections shall be considered"Basic Maintenance". <br /> Item Description Quantity Unit Unit Price Total <br /> 1984-1 PONDEROSA* <br /> 1. Basic Maintenance 12 Month $172.50 $2,070.00 <br /> 2. General Benefit Maintenance 12 Month $518.58 $6,222.96 <br /> 3. Extra Work 1 Allowance $12,000.00 $12,000.00 <br /> Total: $20,292.96 <br /> 1993-1 WINDSOR <br /> 1. Basic Maintenance 12 Month $909.16 $10,909.92 <br /> 2. Weed Abatement 1 LS N/A N/A <br /> 3. Extra Work 1 Allowance $2,500.00 $2,500.00 <br /> Total: $13,409.92 <br /> 1993-2 BONDE RANCH <br /> 1. Basic Maintenance 12 Month $527.50 $6,330.00 <br /> 2. Weed Abatement 1 LS $9,800.00 $9,800.00 <br /> 3. Extra Work 1 Allowance $5,000.00 $5,000.00 <br /> Total: $21,130.00 <br /> 1994-1 OAK TREE FARM <br /> 1. Basic Maintenance 12 Month $510.33 $6,123.96 <br /> 2. Weed Abatement 1 LS $1,500.00 $1,500.00 <br /> 3. Extra Work 1 Allowance $10,000.00 $10,000.00 <br /> Total: $17,623.96 <br /> 1995-1 MOLLER RANCH <br /> 1. Basic Maintenance 12 Month $1,729.25 $20,751.00 <br /> 2. Weed Abatement 1 LS $5,000.00 $5,000.00 <br /> 3. Extra Work 1 Allowance $50,000.00 $50,000.00 <br /> Total: $75,751.00 <br /> Grand Total: $148,207.84 <br /> *All work along Paseo Santa Cruz shall be invoiced as"Basic Maintenance"and all work along the Arroyo <br /> labeled on the map as"Area of General benefit"shall be invoiced as"General Benefit Maintenance." <br /> Exhibit A-Scope of Work 2017-18(revised 2018 6-11).doc <br /> Rev.6/18/2018 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.