Laserfiche WebLink
BACKGROUND <br /> Assessment District No 1974-1 funded the installation of the 8-foot wide, 1.5-inch-thick <br /> asphalt path along the east side of Foothill Road, from Stoneridge Drive to Canyon <br /> Way. The asphalt path, which was installed as part of the street landscaping <br /> improvements in 1979, reached the end of its useful life. Mature trees adjacent to the <br /> path caused uplifting and cracks due to root intrusion into the asphalt area. Local <br /> businesses contacted the City, requesting repairs to the sidewalk. <br /> On February 20, 2018, Pleasanton's City Council awarded the contract to the lowest <br /> responsible bidder, FBD Vanguard Construction, Inc., in the amount of $287,246. <br /> Council authorized the Director of Engineering to approve change orders up to the <br /> project contingency amount of $28,275. The project has since been completed and is <br /> ready for acceptance. <br /> DISCUSSION <br /> Budget <br /> The funding for the project was $400,000, provided from the Annual Sidewalk <br /> Maintenance — Foothill Road along Stoneridge Mall, CIP No. 17512. During the award <br /> for construction of the Annual Curb and Gutter project, CIP No. 17509, a total of <br /> $83,536 was transferred from the CIP No. 17512 project surplus, leaving an available <br /> fund balance of $316,464 for the Annual Sidewalk Maintenance — Foothill Road along <br /> Stoneridge Mall, CIP No. 17512. <br /> A total of two change orders, including a balancing change order, were issued for this <br /> project for a total credit of $4,623. The credit came from a reduction in the sidewalk <br /> installed. The sidewalk replacement was stopped just before Canyon Way as Workday <br /> has future improvements that will modify the intersection and will remove the remaining <br /> portion of the existing sidewalk. Additional plantings were added to the project to fill in <br /> existing gaps in the landscaping. <br /> Work was performed by Suarez and Munoz Construction, Inc. under the City's on-call <br /> contract to adjust an existing below-grade irrigation controller after the sidewalk <br /> installation. The anticipated expenditure for this work is $1,500; however, the final <br /> invoice has not been received. After the final invoice is received and paid, the remaining <br /> balance will be returned to the fund balance. <br /> The final project funding and expenditures are summarized in Attachment 1, indicating a <br /> total project expenditure of $284,868 and a remaining fund balance of $31,596. Staff <br /> recommends the transfer of the remaining balance back to the Street General Fund <br /> after payment to Suarez and Munoz Construction, Inc. is completed. <br /> Page 2 of 3 <br />