My WebLink
|
Help
|
About
|
Sign Out
CCMIN05152018
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2010-2019
>
2018
>
CCMIN05152018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 2:07:02 PM
Creation date
6/20/2018 2:00:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
5/15/2018
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Manager Fialho asked for clarification of what happened during the drought in terms of State <br /> Project water allocations and it was noted 2014 saw the lowest allocation ever, from the State <br /> Water Project and there were restrictions in terms of delivery. It was noted there can be seasonal <br /> restrictions, but it is very unusual and other sources of supply were listed. Sikes Reservoir would <br /> provide additional water and Los Vaqueros would be a storage option. <br /> Brief discussion followed regarding Lake Del Valle and collection of local water. <br /> Director of Operations and Water Utilities Yurchak addressed the Community Survey including <br /> hiring a consultant, survey objectives, November 2015 survey key findings, January 2018 survey <br /> key findings, majority support for the recycled water proposal and reported supporters cite the <br /> need to shore up supplies and there was majority of support for $5 per month or 5% increase in <br /> rates. Additionally, the survey indicated a drought-focused message, around the environment, <br /> was the most persuasive, and presented recommendations. <br /> Councilmember Olson asked for clarification of Pleasanton taking the lead on institutional matters <br /> and Director of Operations and Water Utilities Yurchak reported they will come further down in the <br /> process and includes decision-making, ownership, operation, facilities and the possibility of <br /> establishing a Joint Powers Agreement (JPA). <br /> Councilmember Narum asked about sharing costs and asked about the existence of a formula. <br /> Director of Operations and Water Utilities Yurchak reported that would be part of the institutional <br /> discussion and the framework that needs to be developed. <br /> In terms of next steps, City Manager Fialho reported the Technical Advisory Committee would <br /> work on a set of recommendations and they would be considered by each Board and Commission <br /> based on potential benefits. <br /> City Manager Fialho reported if the City initiates recommendations 1 through 3, there is a series of <br /> discussions that occur at a technical level, which will be shared with the Roundtable and brought <br /> back to each governing board to evaluate. Council's decision tonight is not final and there will be <br /> opportunities to exit. <br /> Councilmember Brown noted costs are nowhere near what the survey shows residents will <br /> tolerate and this is significant debt the City would have to undergo for increased water reliability in <br /> the winter. She wondered how the City would finance that much debt. City Manager Fialho <br /> reported it would depend on the option chosen by the City. Part of the next steps is for staff to <br /> continue to narrow the list of six to something feasible based on policy considerations, capital <br /> costs and operating costs. It is a combination of shared debt between all participating agencies, or <br /> cash that may be on hand to fund the project and will depend on each agency's ability to pay. <br /> Councilmember Narum felt the idea, in terms of financing, would be to float bonds and the unit <br /> cost has financing built into it. Staff reported it is not a reflection of how it will be financed, but <br /> rather staffs attempt at getting an apples-to-apples comparison. <br /> Ms. Prior reported the assumptions for translating that into an annual cost per acre foot, is <br /> assuming what the debt service will be; a thirty-year bond, at 5%. She noted that is somewhat <br /> conservative and noted there are other funding mechanisms considered. She added that each <br /> portion of the portfolio would have a different cost and customers would pay a blended rate <br /> supporting the differences in the portfolio. <br /> Mayor Thorne noted there were no speakers to address this item. <br /> City Council Minutes Page 10 of 11 May 15, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.