Laserfiche WebLink
Ordinance No. 2181 <br /> Page 22 of 25 <br /> City Engineer/Chief Building Official. A sign shall be posted prohibiting the <br /> dumping of hazardous materials into the sanitary sewer. The project <br /> developer shall notify the Dublin-San Ramon Services District (DSRSD) upon <br /> installation of the sanitary connection; a copy of this notification shall be <br /> provided to the Planning Department. <br /> e. All paved outdoor storage areas shall be designed to minimize pollutant <br /> runoff. Bulk materials stored outdoors that may contribute to the pollution of <br /> stormwater runoff must be covered as deemed appropriate by the City <br /> Engineer/Chief Building Official and as required by the State Water Board. <br /> f. All metal roofs, if used, shall be finished with rust-inhibitive paint. <br /> g. Roof drains shall discharge and drain away from the building foundation. Ten <br /> percent of the stormwater flow shall drain to landscaped area or to an <br /> unpaved area wherever practicable. <br /> B. Construction Requirements <br /> The Construction General Permit's construction requirements include, but are not <br /> limited to, the following: <br /> Construction activities (including other land-disturbing activities) that disturb one acre or <br /> more (including smaller sites that are part of a larger common plan of development) are <br /> regulated under the NPDES stormwater program. Operators of regulated construction <br /> sites are required to develop and implement a Stormwater Pollution Prevention Plan <br /> and to obtain a Construction General Permit (NOI) from the State Water Resources <br /> Control Board to discharge stormwater: <br /> http://www.waterboards.ca.qov/water issues/programs/stormwater/docs/finalcon <br /> stpermit.pdf <br /> Stormwater <br /> 1. The project developer shall submit a Stormwater Pollution Prevention Plan <br /> (SWPPP) for review by the City Engineer/Chief Building Official prior to issuance <br /> of building or engineering permits. A reviewed copy of the SWPPP shall be <br /> available at the project site until engineering and building permits have been <br /> signed off by the inspection departments and all work is complete. A site specific <br /> SWPPP must be combined with proper and timely installation of the BMPs, <br /> thorough and frequent inspections, maintenance, and documentation. Failure to <br /> comply with the reviewed construction SWPPP may result in the issuance of <br /> correction notices, citations or stop work orders. <br /> 2. The amendments to the SWPPP and all the inspection forms shall be completed <br /> and available at the site for inspection by the city, county or state staff. <br />