My WebLink
|
Help
|
About
|
Sign Out
ORD 2181
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:26 PM
Creation date
6/14/2018 8:17:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/5/2018
DESTRUCT DATE
PERMANENT
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2181 <br /> Page 13 of 25 <br /> attack, set aside, or void the approval of the project or any permit authorized <br /> hereby for the project, including (without limitation) reimbursing the City its <br /> attorneys fees and costs incurred in defense of the litigation. The City may, in its <br /> sole discretion, elect to defend any such action with attorneys of its choice. <br /> 51. The applicant must provide to the Director of Community Development a building height <br /> certification performed by a licensed land surveyor or civil engineer. Said certification must allow <br /> for the installation of finished roof materials and must meet the approved building height. <br /> 52. Planning Division approval is required before any changes are implemented in <br /> the site design, building design, grading, landscape material, lighting, etc., before <br /> construction begins and after construction is completed. <br /> 53. Alternative vehicle parking shall be provided in compliance with PMC Section <br /> 18.88.035. <br /> 54. Prior to issuance of a building permit, the developer shall pay the required commercial <br /> development school impact fee as prescribed by state law and as adopted by the Pleasanton <br /> Unified School District(PUSD). Written proof of compliance with this condition shall be provided <br /> by Applicant to the City, on a form generated by the PUSD, prior to building permit issuance. <br /> 55. All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall be limited to the hours of <br /> 8 a.m. to 5 p.m., Monday through Saturday. No construction shall be allowed on <br /> State or Federal Holidays or Sundays. The Director of Community Development <br /> may allow earlier "start times" or later "stop times" for specific construction <br /> activities, e.g., concrete pouring. Prior to construction, the hours of construction <br /> shall be posted on site. <br /> 56. Portable toilets used during construction shall be emptied on a regular basis as <br /> necessary to prevent odor. <br /> 57. The project shall provide a minimum bicycle parking equivalent to 5-percent of the total number of <br /> vehicle parking spaces, with a maximum of 20 required bicycle parking spaces. Bicycle parking <br /> shall be shown on the building permit plans for review and approval by the Traffic Engineering <br /> Division prior to building permit submittal. <br /> 58. All bicycle racks shall comply with the following criteria: <br /> a. Located in a visible and accessible location; <br /> b. Support the frame of the bicycle and not just one wheel; <br /> c. Allow the frame and one wheel to be located to the rack; <br /> d. Allow the use of either a cable or U-shaped lock; <br /> e. Be securely anchored; <br /> f. Be usable by bikes with no kickstand; and <br /> g. Be usable by a wide variety of sizes and types of bicycles. <br /> Engineering Division <br /> 59. A "Conditions of Approval" checklist shall be completed and attached to all plan <br /> checks submitted for approval indicating that all conditions have been satisfied. <br />
The URL can be used to link to this page
Your browser does not support the video tag.