My WebLink
|
Help
|
About
|
Sign Out
GHAD
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
061918
>
GHAD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 2:12:42 PM
Creation date
6/12/2018 2:12:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/19/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART III. <br /> OAK TREE FARM GEOLOGIC HAZARD ABATEMENT DISTRICT <br /> METHOD USED IN FORMULATING ASSESSMENTS <br /> A Geologic Hazard Abatement District ("GHAD") is essentially a benefit assessment <br /> district. The proposed estimated assessments set forth in Part I above are based on <br /> the fact that the GHAD is comprised of residential land uses (23 single-family residential <br /> lots in Tract 6563, 16 single family residential lots in Tract 6748, and 2 single-family <br /> residential lots in Parcel Map 8293), the City owned sanitary sewer pump station site, <br /> and the remaining property in Parcel Map 6359, with all lots, other than the remaining <br /> property in Parcel Map 6539, sharing a similar amount of risk and benefit. For the <br /> purpose of formulating GHAD assessments, the benefits and burdens of the GHAD <br /> have been assessed equally to the 41 residential lots and City sanitary sewer pump <br /> station site. <br /> The total proposed budget for the fiscal year of the District (2018-19), in the amount of <br /> $13,772.00, is allocated to the 41 residential lots and to the City owned sanitary sewer <br /> pump station site, and includes interest income. <br />
The URL can be used to link to this page
Your browser does not support the video tag.