Laserfiche WebLink
i <br /> k <br /> wi EXHIBIT A <br /> CITY OF PLEASANTON <br /> ON CALL SURVEY& ENGINEERING CONTRACT <br /> KIER WRIGHT HOURLY RATE SCHEDULE <br /> Civil Engineers £ Surveyors, Inc. Effective July 1,2018 through June 30, 2019 <br /> PRINCIPAL $234.00/Hour <br /> :) <br /> PRINCIPAL ENGINEER $212.00/Hour <br /> SENIOR ENGINEER $ 191.00/Hour <br /> OFFICE ENGINEER $ 171.00/Hour <br /> SENIOR SURVEYOR $ 191.00/Hour <br /> SURVEY SUPERVISOR $-191 00/Hour <br /> OFFICE SURVEYOR $ 171.00/Hour <br /> SURVEY COORDINATOR $ 164.00/Hour <br /> ENGINEERING TECH $ 146.00/Hour <br /> SURVEY TECH $ 146.00/Hour <br /> SENIOR DRAFTSMAN $ 118.00/Hour <br /> DRAFTSMAN $ 113.00/Hour <br /> SURVEY DRAFTSMAN $ 91.00/Hour <br /> 1-MAN SURVEY CREW $ 164.00/Hour <br /> 2-MAN SURVEY CREW $293.00/Hour <br /> 3-MAN SURVEY CREW $ 392.00/Hour <br /> TESTIMONY(TRIAL OR DEPOSITION) $ 457.00/Hour <br /> ENGINEERING COORDINATOR $ 77.00/Hour <br /> ENGINEERING INTERN $ 48.00/Hour <br /> All blueprinting and reproduction will be billed at cost plus 10%. Time spent <br /> for preparation for testimony will be billed in accordance with the above <br /> hourly rates. <br /> 2850 Collier Canyon Road • Livermore, California 94551-9201 • (925) 245-8788 • FAX (925) 245-8796 <br />