Laserfiche WebLink
+millro7srtli <br /> INTERACTIVE <br /> RESOURCES <br /> architects+engineers <br /> Standard Rate Schedule <br /> Exhibit A <br /> July 1, 2018 to June 30, 2019 <br /> Title Billing Rate(1st yr.) <br /> President/Sr. Project Manager $215.00 <br /> Managing Principal/Sr. Project Manager $195.00 <br /> Associate Principal/Sr.Project Manager $175.00—$185.00 <br /> Project Manager $170.00—$175.00 <br /> Senior Structural Engineer $175.00 <br /> Professional Engineer $145.00 <br /> *Senior Designer/Drafter $125.00—$140.00 <br /> *Designer/Drafter $125.00 <br /> Technical Support $90.00—$120.00 <br /> Standard Consultant Mark-up is 15% <br /> In-House CAD Drawing Plots(Black and White) $1.00 square footage <br /> In-House Color Copies $1.50 <br /> In-House Black and White Copies $.15 cents <br /> Postage and Reproduction is actual cost plus 10% markup(outside expenses) <br /> Expenses: Reimbursable expenses are in addition to hourly fees. Reimbursable expenses include such <br /> items as postage, reproduction, CAD drawing plotting, printing, special materials or equipment, storage <br /> of investigative samples or forensic evidence, meals when traveling out of the Bay Area for the project, <br /> and travel at the IRS standard mileage rate of$0.535 cents per mile. Lodging, meals and incidentals, for <br /> overnight travel, will be reimbursed either at cost or the Per Diem rates. <br /> Any yearly adjustments to the established rate schedule above will follow the ENR Construction <br /> Cost Index for San Francisco, California and the City of Pleasanton's cap of 3%maximum yearly <br /> escalation of billing rates. <br /> Rates are subject to change as employees receive salary modifications. <br /> *Interactive Resources may opt to utilize contract employees for peak loads Last revision February 8,2018 <br /> 117 Park Place,Point Richmond,CA 94801 I Tel:510.236.7435 I Fax:510.232.5325 I www.intres.com �! <br />