My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
060518
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 11:19:04 AM
Creation date
5/30/2018 11:18:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/5/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2181 <br /> Page 18 of 22 <br /> • The underground pipeline contractor shall submit a minimum of three (3) sets of <br /> installation drawings to the Fire Department, Fire Prevention Bureau. The plans shall <br /> have the contractor's wet stamp indicating the California contractor license type, <br /> license number and must be signed. No underground pipeline inspections will be <br /> conducted prior to issuance of approved plans. <br /> • All underground fire protection work shall require a California contractor's license <br /> type as follows: C-16, C-34, C-36 or A. <br /> • All field-testing and inspection of piping joints shall be conducted prior to covering of <br /> any pipeline. <br /> Building and Safety Division <br /> 99. The project developer shall submit a record of survey and a site development plan in <br /> accordance with the provisions of Chapter 18.68 of the Municipal Code of the City of <br /> Pleasanton. These plans shall be approved by the Chief Building Official prior to the <br /> issuance of a building permit. The site development plan shall include all required <br /> information to design and construct site, grading, paving, drainage, and utilities. <br /> Urban Stormwater Conditions <br /> The project shall comply with the NPDES Permit No. CAS612008, dated November 19, 2015, <br /> and amendments, issued the by California Regional Water Quality Control Board, San <br /> Francisco Bay Region, a copy of which is available at the Community Development Department, <br /> Public Works/Engineering section at City offices, Alameda County Clean Water Program and at <br /> State Water Board: <br /> (http://www.waterboards.ca.gov/sanfranciscobay/water issues/proqrams/stormwater/Municipal/i <br /> ndex.shtml; <br /> The project shall comply with the "Construction General Permit" as required by the San <br /> Francisco Bay Regional Water Quality Control Board: <br /> (http://www.waterboards.ca.qov/water issues/proqrams/stormwater/construction.shtml) <br /> A. Design Requirements <br /> 1. The NPDES Permit design requirements include, but are not limited to, the following: <br /> a. Source control, sight design measures, and design and implementation of <br /> stormwater treatment measures are required when commercial, industrial or <br /> residential development creates and replaces 10,000 square feet or more of <br /> impervious surface, including roof area, streets and sidewalk. <br /> b. Hydro-modification standards are required when a new development or <br /> redevelopment project creates and replaces total impervious area of one acre or <br /> more. <br /> c. The NPDES Permit requires a proactive Diazinon pollutant reduction plan (aka <br /> Pesticide Plan) to reduce or substitute pesticide use with less toxic alternatives. <br /> d. The NPDES Permit requires complying with the Copper Pollutant Reduction Plan <br /> and the Mercury Pollutant Reduction Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.