My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
060518
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 11:19:04 AM
Creation date
5/30/2018 11:18:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/5/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2181 <br /> Page 13 of 22 <br /> incorporated into the development. The consultant shall certify by writing on the plans or <br /> as otherwise acceptable to the City Engineer that the final development plan is in <br /> conformance with the geotechnical report approved with the project. <br /> 61. The project developer shall arrange and pay for the geotechnical consultant to inspect <br /> and approve all foundation, retaining, and wall and drainage geotechnical aspects of <br /> project construction. The consultant shall be present on site during grading and <br /> excavation operations. The results of the inspections and the as-built conditions of the <br /> project shall be certified in writing by the geotechnical consultant for conformance to the <br /> approved plans and geotechnical report and submitted to the City Engineer for review <br /> and approval prior to occupancy. <br /> 62. All existing septic tanks or holding tanks shall be properly abandoned, pursuant to the <br /> requirements of the Alameda County Department of Health Services prior to the start of <br /> grading operations, unless specifically approved by the City Engineer. <br /> 63. The haul route for all materials to and from this development shall be approved by the <br /> City Engineer prior to the issuance of a permit, and shall address the need to schedule <br /> major truck trips and deliveries during off peak travel times, to avoid peak travel <br /> congestion. It shall also include the provision to monitor the street surfaces used for the <br /> haul route so that any damage and debris attributable to the haul trucks is identified and <br /> corrected at the expense of the project applicant or developer. <br /> 64. All dry utilities (electric power distribution, gas distribution, communication service, Cable <br /> television, street lights and any required alarm systems) required to serve existing or <br /> new development shall be installed in conduit, underground in a joint utility trench unless <br /> otherwise specifically approved by the City Engineer. <br /> 65. Any damage to existing street improvements during construction on the subject property <br /> shall be repaired to the satisfaction of the City Engineer at full expense to the project <br /> developer and includes but is not limited to slurry seal, overlay, restoration of <br /> landscaping and irrigation system, signing, striping, pavement marking or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> 66. There shall be no direct roof leaders connected to the street gutter or storm drain <br /> system, unless otherwise approved by the City Engineer. <br /> 67. The project developer and/or the project developer's contractor(s) shall obtain an <br /> encroachment permit from the City Engineer prior to moving any construction equipment <br /> onto the site. <br /> 68. The project developer shall submit a final grading and drainage plan prepared by a <br /> licensed civil engineer depicting all final grades and drainage control measures, <br /> including concrete-lined V-ditches, to protect all cut and fill slopes from surface water <br /> overflow. This plan shall be subject to the review and approval of the City Engineer prior <br /> to the issuance of a subdivision grading permit. <br /> 69. The project developer shall include erosion control measures on the final grading plan, <br /> subject to the approval of the City Engineer. The project developer is responsible for <br /> ensuring that the contractor is aware of such measures. All cut and fill slopes shall be <br /> revegetated and stabilized as soon as possible after completion of grading, in no case <br /> later than October 15. No grading shall occur between October 15 and April 15 unless <br /> approved erosion control measures are in place, subject to the approval of the City <br />
The URL can be used to link to this page
Your browser does not support the video tag.