My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
051518
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 11:16:51 AM
Creation date
5/10/2018 11:16:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/15/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Improvements Along the Project Frontage of 240 Kottinger Drive <br /> • Constructed 5-foot wide concrete sidewalk and four ADA curb ramps along the <br /> project frontage on Kottinger Drive and Vineyard Avenue. <br /> • Constructed 1,012 feet of new concrete pedestrian pathway along the project <br /> boundary with Kottinger Park that connects Vineyard Avenue and Kottinger <br /> Drive. <br /> • Relocated the existing bus stop along the project frontage on westbound <br /> Kottinger Drive, which included a bus shelter and seating. <br /> Staff has inspected the work and determined that all public improvements have been <br /> constructed in compliance with the public improvement agreements and are ready for <br /> acceptance. <br /> Submitted by: Fiscal Review: Approved b • <br /> X/Ir <br /> Stephen Kirkpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachment: <br /> 1. Vicinity Map <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.