Laserfiche WebLink
Public Improvements Along the Project Frontage of 240 Kottinger Drive <br /> • Constructed 5-foot wide concrete sidewalk and four ADA curb ramps along the <br /> project frontage on Kottinger Drive and Vineyard Avenue. <br /> • Constructed 1,012 feet of new concrete pedestrian pathway along the project <br /> boundary with Kottinger Park that connects Vineyard Avenue and Kottinger <br /> Drive. <br /> • Relocated the existing bus stop along the project frontage on westbound <br /> Kottinger Drive, which included a bus shelter and seating. <br /> Staff has inspected the work and determined that all public improvements have been <br /> constructed in compliance with the public improvement agreements and are ready for <br /> acceptance. <br /> Submitted by: Fiscal Review: Approved b • <br /> X/Ir <br /> Stephen Kirkpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachment: <br /> 1. Vicinity Map <br /> Page 3 of 3 <br />