Laserfiche WebLink
haul route so that any damage and debris attributable to the haul trucks is identified and <br /> corrected at the expense of the project applicant or developer. <br /> 64. All dry utilities (electric power distribution, gas distribution, communication service, <br /> Cable television, street lights and any required alarm systems) required to serve <br /> existing or new development shall be installed in conduit, underground in a joint utility <br /> trench unless otherwise specifically approved by the City Engineer. <br /> 65. Any damage to existing street improvements during construction on the subject property <br /> shall be repaired to the satisfaction of the City Engineer at full expense to the project <br /> developer and includes but is not limited to slurry seal, overlay, restoration of <br /> landscaping and irrigation system, signing, striping, pavement marking or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> 66. There shall be no direct roof leaders connected to the street gutter or storm drain <br /> system, unless otherwise approved by the City Engineer. <br /> 67. The project developer and/or the project developer's contractor(s) shall obtain an <br /> encroachment permit from the City Engineer prior to moving any construction <br /> equipment onto the site. <br /> 68. The project developer shall submit a final grading and drainage plan prepared by a <br /> licensed civil engineer depicting all final grades and drainage control measures, <br /> including concrete-lined V-ditches, to protect all cut and fill slopes from surface water <br /> overflow. This plan shall be subject to the review and approval of the City Engineer prior <br /> to the issuance of a subdivision grading permit. <br /> 69. The project developer shall include erosion control measures on the final grading plan, <br /> subject to the approval of the City Engineer. The project developer is responsible for <br /> ensuring that the contractor is aware of such measures. All cut and fill slopes shall be <br /> revegetated and stabilized as soon as possible after completion of grading, in no case <br /> later than October 15. No grading shall occur between October 15 and April 15 unless <br /> approved erosion control measures are in place, subject to the approval of the City <br /> Engineer. Such measures shall be maintained until such time as a permanent <br /> landscaping is in place. <br /> 70. All existing drainage swales that are filled shall have subdrains installed unless <br /> otherwise approved by the City Engineer and the developer's soils engineer. All <br /> subdrains shall have cleanouts installed at the beginning of the pipe. The end of the <br /> pipe shall terminate in a storm drain or other storm drain outfall, subject to the approval <br /> of the City Engineer. The applicant's engineer shall submit a final subdrain location map <br /> to the City Engineer prior to acceptance of the public improvements. It shall be the <br /> responsibility of the owner to relocate a subdrain if a subdrain is encountered during the <br /> excavation of any subsurface structure. <br /> PUD-125, 2350 Santa Rita Road Planning Commission <br /> Page 12 of 23 <br />