My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
051518
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 5:42:37 PM
Creation date
5/10/2018 9:54:17 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/15/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br />RESOLUTION NO. <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PLEASANTON ADOPTING An <br />ADDENDUM TO THE INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FOR THE <br />RECYCLED WATER PROJECT <br />WHEREAS, on September 16, 2014, by Resolution No. 14-710, the City of Pleasanton <br />City Council adopted a Final Initial Study/Mitigated Negative Declaration for the Recycled Water <br />Project for the construction of up to approximately 22 miles (115,200 linear feet) of 6 -inch to 18 - <br />inch pipeline as well as approximately 3.2 miles (16,500 lineal feet) of existing pipeline that will <br />be repurposed from abandoned or existing potable pipelines (Proposed Project) in accordance <br />with the requirements of the California Environmental Quality Act (CEQA) and state and local <br />guidelines implementing CEQA; and <br />WHEREAS, after incorporating design efficiencies into the pipeline infrastructure for the <br />Proposed Project, this resulted in the need for a new booster pump station at the Ken Mercer <br />Sports Park to have sufficient pressure for irrigation and the City, as the lead agency under <br />CEQA, prepared an Addendum to the Initial Study/Mitigated Negative Declaration; and <br />WHEREAS, the City voluntarily provided for a 15 -day comment period which was <br />published on April 12, 2018 and ended on April 27, 2018 with no comments received; and <br />WHEREAS, the City's Addendum to the Initial Study/Mitigated Negative Declaration for <br />the Proposed Project concludes that the proposed booster pump station will not result in any <br />new significant impacts, substantially increase the severity of the previously disclosed impacts, <br />and/ or involve any of the other conditions related to changed circumstances or new information <br />that can require a subsequent or supplemental EIR under Public Resources Code §21166 and <br />CEQA Guidelines § 15162 beyond hose impacts and conditions already identified in the City's <br />Final Initial Study/Mitigated Negative Declaration; it therefore is appropriate for the City to <br />approve the proposed changes to the Proposed Project. <br />NOW, THEREFORE BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF <br />PLEASANTON DOES RESOLVE, DECLARE, DETERMINE AND ORDER THE FOLLOWING: <br />SECTION 1. The City Council has: (1) independently reviewed and analyzed the <br />CEQA Addendum and other information in the record and has considered the information <br />contained therein prior to acting upon or approving the Proposed Project; (2) the CEQA <br />Addendum to the Initial Study/Mitigated Negative Declaration prepared for the Proposed Project <br />has been completed in compliance with CEQA and is consistent with State and local guidelines <br />implementing CEQA; and (3) the Addendum represents the independent judgment and analysis <br />of the City as lead agency for the Proposed Project. The City designates the City's Director of <br />Operation Services as the custodian of documents and records of proceedings on which this <br />decision is based. <br />SECTION 2. The City Council does hereby adopt the Addendum to the Initial <br />Study/Mitigated Negative Declaration prepared for the Proposed Project. The Addendum, <br />Addendum, Final Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and <br />Reporting Program are: (1) on file with the City at its Operation Services Center at 333 Busch <br />Road, Pleasanton; and (2) available for inspection by any interested party. <br />
The URL can be used to link to this page
Your browser does not support the video tag.