My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
050118
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 12:56:47 PM
Creation date
4/26/2018 11:34:25 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/1/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. PARKS AND RECREATIONAL FACILITIES <br /> The parks and recreational facilities portion of the fee covers improvements to existing City <br /> recreation facilities as well new parks though buildout (including any required land acquisition <br /> costs). Since parks and recreation serve largely the needs of residents, it is assumed that new <br /> residential development will pay a parks and recreational facilities impact fee, similar to the <br /> existing fee structure. <br /> Facility and Cost Assumptions <br /> Parks and recreational facilities are broken down into existing and new improvements. Each is <br /> described below with the total cost shown in Table 8. <br /> Table 8 Parks and Recreation Improvements Allocated to Existing and New <br /> Development* <br /> Item Source Total (rounded) <br /> Existing Parks and Recreation <br /> Facility Improvement Needs Cost(1) (2) Table 9 $45,374,000 <br /> Bicycle/Pedestrian Trail Improvements(1) $35,895,600 <br /> Subtotal $81,269,600 <br /> New Parks and Recreation <br /> Civic Center Park and Amphitheater(3) Table 10 $18,858,000 <br /> Bernal Community Park- Phase 3 Table 11 $3,640,000 <br /> East Pleasanton Table 11 $98,800,000 <br /> Vineyard Corridor Table 11 $52,000,000 <br /> Alviso Adobe (Adjacent to Austin Property) Table 11 $5,460,000 <br /> Callippe Trails Cost Table 11 $650,000 <br /> Staples Ranch Community Park Table 11 $15,470,000 <br /> Subtotal $194,878,000 <br /> Total $276,147,600 <br /> *Note: rounded;excludes land acquisition as the City has adequate land supply to meet new growth needs. <br /> (1)Estimated by the City and provided to EPS on 09.01.16.Assume a 30%contingency reflective of 15%for conceptual planning, <br /> 10%for design/engineering,and 5%for combined permits,fees,FF&Es,and project management contingency. <br /> (2)Improvements across a range of parks include items like new benches and lighting installations,turf resurfacing,paving,etc. <br /> Existing Parks and Recreation <br /> A number of existing parks require various levels of improvements and facility remodels. As <br /> shown in Table 9, such improvements are estimated for about 30 various locations in the City, <br /> including joint school use facilities. The City staff estimates the cost for these improvements to <br /> be $52.6 million with about $45.4 million as unfunded. These facilities will continue to serve the <br /> citywide needs of existing and new service population. Additionally, the City is planning various <br /> improvements to the existing bicycle and pedestrian infrastructure. The cost for these <br /> improvements is estimated at $35.9 million, including contingencies. <br /> Economic& Planning Systems, Inc. 10 P:\151000s\151111PleasantonFee\Report\151111_FeeNexus_042318.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.