Laserfiche WebLink
Pleasanton Development Impact Fee Nexus Study <br /> Draft Report 04/23/18 <br /> • Fee Amount Must Be Based On A Rational Nexus. An impact fee amount must be based <br /> on a reasonable nexus, or connection, between new development and the needs and <br /> corresponding costs of the capital facilities and improvements need to accommodate it. As <br /> such, an impact fee must be supported by specific findings that explain or demonstrate this <br /> nexus or relationship. In addition, the impact fee amount must be structured such that the <br /> revenue generated does not exceed the cost of providing the facility or improvement for <br /> which the fee is imposed. <br /> Summary of Maximum Proposed Fee Schedule <br /> Table 1 summarizes the City's maximum allowable development impact fee schedule for the <br /> capital facility and equipment needs evaluated in this Nexus Report. As noted above, the City <br /> can adopt fees below these maximum, nexus-supported levels based on policy considerations. <br /> The nexus documentation and maximum allowable fee levels for the affordable housing and <br /> commercial linkage fees are provided under a separate cover. <br /> Table 1 Summary of Maximum Capital Facility Development Impact Fees <br /> Residential Development Non-Residential Development <br /> Item Single Family Multi-Family Office Retail R&D Industrial/Distribution Hotel/Motel <br /> per unit per unit per sq.ft. per sq.ft. per sq.ft. per sq.ft. per room <br /> Parks and Recreational Facilities $13,843 $9,863 $0.00 $0.00 $0.00 $0.00 $0 <br /> Downtown Beautification $80 $57 $0.06 $0.04 $0.04 $0.02 $21 <br /> Public Facilities <br /> Fire $155 $111 $0.12 $0.07 $0.08 $0.03 $40 <br /> Police $525 $374 $0.42 $0.25 $0.27 $0.11 $136 <br /> Downtown Parking $118 $84 $0.10 $0.06 $0.06 $0.02 $31 <br /> Civic Center $3,894 $2,774 $3.13 $1.85 $2.04 $0.81 $1,009 <br /> Transportation $9,357 $5,758 $14.60 $23.65 $11.00 $8.84 $6,170 <br /> Total $27,972 $19,021 $18.44 $25.92 $13.50 $9.84 $7,406 <br /> Total With 3%Admin Cost(1) $28,812 $19,592 $18.99 $26.70 $13.90 $10.14 $7,628 <br /> (1)This fee falls within a reasonable range typically charged through development impact fees for administrative expenses. <br /> Sources:City of Pleasanton;and Economic&Planning Systems,Inc. <br /> These development impact fees apply to new residential and nonresidential development based <br /> on a "fair share" allocation of specified capital facility and equipment costs. The maximum fee <br /> estimates include a 3 percent fee program administration fee, consistent with other Mitigation <br /> Fee Act program administrative costs in many other California jurisdictions.1 Fees apply to all <br /> new development inside the City limits, unless otherwise exempted by Ordinance. When <br /> adopted, the new fees will replace the City's existing fee schedule charged to new development <br /> (exclusive of existing development agreements), for parks and recreational facilities, public <br /> facility improvements, and transportation, and will add a new fee for downtown beautification. <br /> 1 The 3 percent administration cost is designed to cover expenses for preparation of the development <br /> impact fee and subsequent updates as well as the required reporting, auditing, collection and other <br /> annual administrative costs involved in overseeing the program. Development impact fee programs <br /> throughout California have applied similar administrative charges. <br /> Economic&Planning Systems, Inc. 3 P:\151000s1151111PleasantonFee\Report1151111_FeeNexus_042318.docx <br />