My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
042318
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2018 10:51:23 AM
Creation date
4/19/2018 10:51:20 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
presented to City Council in September 2017 and construction was completed in the <br /> winter of 2017 with the exception of the arterial intersection improvements. <br /> • Status Under Review <br /> • Next Steps/Details: Design (spring 2018) and construct(2019) arterial <br /> intersection improvements at Bernal Avenue and Sunol <br /> Boulevard/First Street intersection. Upon completion of <br /> intersection improvements, conduct after-implementation <br /> study. <br /> Regional Projects <br /> 65. State Route 84 I Transportation/Traffic Project <br /> There are two separate projects underway on State Route (SR) 84. The segment of SR 84 <br /> from Concannon Boulevard to Ruby Hill Drive is under construction and will widen the <br /> roadway from one lane in each direction to two lanes in each direction. This project is <br /> managed by Alameda County Transportation Commission and has an estimated project <br /> completion date of fall 2017. <br /> The segment of SR 84 from Pigeon Pass to 1-680 has completed environmental review <br /> and it is anticipated that Caltrans will adopt the environmental document in spring 2018. <br /> Preliminary engineering and design is scheduled to begin in February 2018 (prior to <br /> adoption of the EIR). The design process and right of way acquisition will take <br /> approximately two years with construction to follow in 2020. <br /> Construction of the segment of SR 84 from Pigeon Pass to I-680 will be the final segment <br /> in a series of improvements to widen SR 84 to expressway standards from 1-580 in <br /> Livermore to 1-680 in Sunol. Environmental review of the SR 84 project began in 2002, <br /> and completion of this final segment will conclude this nearly 20-year project. <br /> • Status Under Review <br /> • Next Steps/Details: Alameda CTC to award design contract in spring 2018 <br /> and begin ROW acquisition. Caltrans to approve the <br /> Environmental Document (Spring 2018) <br /> 66. BART to Livermore I Transportation/Traffic Project <br /> The San Francisco Bay Area Rapid Transit(BART) District is currently studying the <br /> extension of BART service to a new station within the I-580 median at Isabel Avenue. <br /> The project consists of a 5.5-mile extension of the BART rail line along I-580 from the <br /> existing Dublin/Pleasanton Station to a new station in the vicinity of the Isabel Avenue <br /> interchange. <br /> Included in this study is the evaluation of three alternatives, which may be implemented <br /> in place of a full BART extension. These alternatives include a Diesel Multiple Unit or <br /> Electric Multiple Unit(DMU/EMU) alternative, which is a rail vehicle, but one that is <br /> not compatible with the BART rail design; an Express Bus alternative that would add a <br /> direct access ramp to the existing East Dublin Pleasanton BART Station; and an <br />
The URL can be used to link to this page
Your browser does not support the video tag.