My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
041718
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2018 4:34:39 PM
Creation date
4/12/2018 4:23:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/17/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.44.030 Definitions <br /> For the purposes of this chapter, the following definitions apply: <br /> A. "Developer" means an individual or entity submitting an application for a building <br /> permit or other entitlement for development in the Johnson Drive Economic Development Zone. <br /> B. "Development" means new development in the Johnson Drive Economic <br /> Development Zone. <br /> C. "Johnson Drive Economic Development Zone" means the area subject to PUD- <br /> 105, adopted by Ordinance No. 2171, as shown on Exhibit A. <br /> D. "Street improvements" means the following improvements, described in more <br /> detail in the Supplemental Environmental Impact Report that the city council certified, by <br /> Resolution No. 17-976, for the Johnson Drive Economic Development Zone: <br /> 1. Commerce Drive at Johnson Drive Signal (Mitigation 4.D-1a) <br /> 2. Johnson Drive at Owens Drive (North) Signal (Mitigation 4.D-1b) <br /> 3. Johnson Drive at Stoneridge Drive Intersection - left turn (Mitigation 4.D-1c) <br /> 4. Johnson Drive widening (Mitigation 4.D-3) <br /> 3.44.040 Amount of Fee <br /> A. The amount of the fee shall be established by resolution of the city council. The <br /> fee shall be based on the cost of the street improvements divided by the total trips generated by <br /> development. The number of total trips shall be based on land use type and building square <br /> footage of development. <br /> B. The fee shall be subject to an annual inflation adjustment on January 1 of each <br /> year based upon the Engineering New Record Construction Cost Index for the San Francisco— <br /> Bay Area. <br /> 3.44.050 Payment of Fee <br /> A. The full amount of the fee shall be paid at the time of: issuance of a building <br /> permit; or conversion or change in use of an existing structure which individually or cumulatively <br /> increases the peak hour trip rate by 10 or more trips. <br /> B. Development consisting of the repair or replacement of structures, provided that <br /> such repair or replacement does not result in any conversion or change in land use, or any <br /> enlargement of gross floor area beyond that of the previous structure, is exempt from the fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.