My WebLink
|
Help
|
About
|
Sign Out
RES 04003
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2004
>
RES 04003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2004 2:04:30 PM
Creation date
2/4/2004 1:54:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/20/2004
DOCUMENT NO
RES 04003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL IMPROVEMENT PROGRAM <br />STREETS PROJECTS <br /> <br /> Quarter 1 (Numbers in italics signify amendments/transfers already approved by Council) <br />o:$016 Sunol Blvd Reconstruction (or Widening): Junipero to 1-680 Phase I 0 <br />o250~ Foothill at Muirwood Dr South: Street AlignmentNew Traffic Signal <br /> Vineyard Corridor Infrastructure Improvements Phase l - Joint City PUSD 0 <br /> Dougher~ Valley Mitigation Revenue Reserve (Recommended funding is m 0 <br />025023 addition to an existing reserve of $50,000) <br />o25o3o Foothill Road Improvements, South of Oak Creek Drive 0 <br />025039 Traffic Signal at Pleasanton Ave and Bemal 0 <br />o2sono Traffic Signal at West Las Positas and Dorman 52,000 <br />o25oq I Traffic Signal at Vineyard and Montevino 52,000 <br /> 0 <br />025042 Bemal St Improvements at Valley <br />025055 Neighborhood Traffic Calming Devices (25,000) (25,000) <br /> First and Kottinger Undergrounding for Street Liggts and Laterals <br />o25071 (Recommended funding is in addition to a project reserve of $50,000) 123,213 58,137 ! 181,350 <br />o35003 Annual Resurfacing of Various Streets 55,000 (153,000~ ~ (98,000) <br />035004 Annual Slurry Sealing of Various Streets 0 <br />o35005 Annual Sidewalk and Intersection Ramp Installations (1,373) (I,37J~ <br />oasoo6 Happy Valley Bypass Road 500,000 500,00(3 <br />035oo? Annual Traffic Buttons and Line Markers Installation 0 <br />o~oo9 Annual Curb and Gutter Replacements for Street Resurl~acing Projects 22,440 22,44(3 <br />oasol2 Annual Sidewalk Maintenance 0 <br />o~so~9 Curb and Gutter Replacement and Street Resuffacin~ of Haleakala Court (55,000) <br /> Hacienda Drive ~ Owens Drive: Reconfigure Intersection and Upgrade 0 <br />o~o2o Traffic Signal <br />o~502t Evaluation and Reclassification of Street Surfaces 34,487 13,782 48,269 <br /> Sunol Blvd. Reconstruction (or Widening): Junipera to 1-680 Pgase 11 0 <br />o~5o22 (Reserve) 0 <br />o~50Ss Neighborhood Traffic Calming Devices <br />o~5o54 Installation of New Traffice Signals at Various Locations 17,000 17,000~ <br />800014 Stoneridge Dr Specific Plan Study 02 <br />8oso~ Signal - Main (~ Vervais - Reimburse Developer 0~ <br />805011 Peoplesoft Reimbursement - Traffic Equipment <br />805012 Vineyard (~ Ruby Hill - Traffic Equipment <br />805014 Right of Way Transfer to Caltrans (NPID3) <br />so5ols Traffic Signal at Bemal & Tawny 132,532 132,532_ <br />935o~o Extension of Livingston WaF <br /> Arroyo de la Laguna Imp: Removal of old Bemal Bridge Foundation <br />915o45 (Recommended funding is in addition to existing reserve of $125,000) 75,000 75,000... <br />osso:9 First St Bridge at Arroyo Del Valle; Interim hnprove (ISTEA/HBRR) 0 <br />965021 Bridge Painting (1996-97) (45,000 (45,000~) <br /> <br />B - STREETS - l ] Streets QI 04 Final with Page Breaks xls I/9/2004 3:04 PM <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.