Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />STREETS PROJECTS <br /> <br /> 2003-04 Original Adopted Budget <br />o250~6 ~ Sunol Blvd Reconstruction (or Widening): Junipero to 1-680 Phase I <br />025019 Foothill at Muirwood Dr. South: Street Alignmentblew Traffic Signal <br /> Vineyard Corridor infrastructure Improvements Phase I - Joint City PUSD <br /> Dougherty Valley Mitigation Revenue Reserve (Recommended funding is in <br />025023 addition to an existing reserve of $50,000) 50,000 <br />025030 ~ Foothill Road Improvements, South of Oak Creek Drive <br />025039 I Traffic Signal at Pleasanton Ave and Bernal <br />025040 Traffic Signal at West Las Positas and Dorman <br />025041 Traffic Signal at Vineyard and Montevino <br />025042 Beraal St Improvements at Valley <br />o25o35 Neighborhood Traffic Calming Devices <br /> First and Kottinger Undergrounding for Street Lights and Laterals 300,00~ <br />025071 (Recommended funding is in addition to a project reserve of $50,000) 300,000 <br />o35oo3 Annual Resurfacing of Various Streets 294,543 1,605,457 1,900,00~ <br />035oo4 Annual Slurry Sealing of Various Streets 20,000 100,000 120,00~ <br />035005 Annual Sidewalk and Intersection Ramp Installations 80,000 40,000 120,001 <br />0350o6 Happy Valley Bypass Road <br />035oo7 Annual Traffic Buttons and Line Markers Installation 100,000 100,001 <br />035oo9 Annual Curb and Gutter Replacements for Street Resurfacing Projects 125,000 125,00~ <br />o33o12 Annual Sidewalk Maintenance 100,000 100,00~ <br />o35o~9 Curb and Gutter Replacement and Street Resurfacing of Haleakala Court 55,000 55,00~ <br />035020 Traffic Si~3nal 25,000 <br />035021 Evaluation and Reclassification of Street Surfaces 20,000 20,00~ <br /> Sunol Blvd. Reconstruction (or Widening): Junipero to 1-680 Phase 1I <br />035022 (Reserve) 193,920 306,080 500,00~ <br />035o55 Nei~jaborhood Traffic Calming Devices 50,000 50,00~ <br />045054 Installation of New Traffice Signals at Various Locations <br />sooo14 Stoneridge Dr Specific Plan Study <br />sosoo8 Signal - Main (~ Vervais - Reimburse Developer <br />805011 Peoplesoff Reimbursement - Traffic Equipment <br />80~0~2 Vineyard ~ Ruby Hill - Traffic Equipment <br />805014 Right of Way Transfer to Caltrans (NPID3) <br />8o5ot5 Traffic Sitgnal at Bema] & Tawny <br />935030 Extension of Livingston Way <br /> Arroyo de la Laguna Imp: Removal of old Bemal Bridge Founda0on <br />935045 (Recommended funding is in addition to existing reserve of $125,000) 175,000 175,00t <br />955029 First St Bridge at Arroyo Del Valle; Interim Improve (1STEMHBRR) <br />965~21 Bridge Paintin[~ (1996-97) <br /> <br />B - STREETS - 3 streets Q1 04 Final with Page Breaks xls 1/9/2004 3:04 PM <br /> <br /> <br />