Laserfiche WebLink
Freeway HOV/Express Lane (2040) <br /> • Conventional BART and all project alternatives— All HOV/express lane segments <br /> operate at acceptable level-of-service during the AM and PM peak periods, therefore <br /> there is no impact. <br /> Intersection Level-of-Service Impacts (2025) <br /> Hopyard Road and Owens Road <br /> • Conventional BART — This alternative adds an additional 31 trips in the PM period <br /> compared to No Project Conditions. The City of Pleasanton Threshold is 10 additional <br /> trips. Because operational and geometrical changes are not feasible at this location to <br /> reduce the impact to Less than Significant, it is considered a Significant and <br /> Unavoidable Impact. <br /> • DMU/EMU — This alternative adds an additional 43 trips to the PM period compared to <br /> No Project Conditions. The City of Pleasanton Threshold is 10 additional trips. Because <br /> operational and geometrical changes are not feasible at this location to reduce the <br /> impact to Less than Significant, it is considered a Significant and Unavoidable Impact. <br /> • Express Bus — This alternative performs similar to the No Project Alternative. <br /> • Enhanced Bus —This alternative performs similar to the No Project Alternative. <br /> Intersection Level-of-Service Impacts (2040) <br /> Hopyard Road and Owens Road <br /> • Conventional BART — This alternative adds an additional 253 trips in the AM period and <br /> 220 additional trips in the PM peak compared to No Project Conditions. The City of <br /> Pleasanton Threshold is 10 additional trips. Because operational and geometrical <br /> changes are not feasible at this location to reduce the impact to Less than Significant, it <br /> is considered a Significant and Unavoidable Impact. <br /> • DMU/EMU — This alternative adds an additional 133 trips in the PM period compared to <br /> No Project Conditions. The City of Pleasanton Threshold is 10 additional trips. Because <br /> operational and geometrical changes are not feasible at this location to reduce the <br /> impact to Less than Significant, it is considered a Significant and Unavoidable Impact. <br /> • Express Bus/BRT —This alternative performs similar to the No Project Alternative. <br /> • Enhanced Bus — This alternative performs similar to the No Project Alternative. <br />