costs of the various design and construction components each of the each of the JDEDZ Street <br /> Improvements and Stoneridge Drive and 1-680 Project. The City Engineer shall approve or <br /> disapprove the Final Cost Estimate within thirty(30) days of receipt. If the Final Cost Estimate <br /> exceeds the original cost estimate for the Project Improvements and either Party determines that <br /> the amount that the Final Cost Estimate exceeds the original cost estimate is too great, the Parties <br /> shall meet and confer to seek a resolution to the excessive cost estimate. If the parties cannot <br /> find a solution to the excessive cost estimate, either Party may terminate this Agreement in <br /> accordance with Section 5.2. If the City Engineer disapproves an item or aspect of the Final <br /> Cost Estimate other than the estimated cost, the Parties shall meet and confer to resolve any <br /> contested or questioned line items or aspects. If the Parties cannot resolve a dispute over an item <br /> or aspect of the Final Cost Estimate other than the cost, either party may cause the dispute to be <br /> presented to the Auditor for resolution. <br /> Section 3.3 Improvement Agreement and Construction of the Project Improvements. <br /> After approval of the improvement plans and specifications for the Project Improvements by the <br /> City Engineer as provided in Section 3.1, Costco and the City will enter into the Improvement <br /> Agreement. Costco shall use diligent and good faith efforts to obtain approval of all required <br /> permits and entitlements necessary to construct each of the Project Improvements and to <br /> construct such improvements in a timely fashion and in accordance with the Improvement <br /> Agreement. Provided, however, if the other public agencies involved in the approval and <br /> construction of the Project Improvements request or require that the City take the lead in the <br /> permitting process, the City will do so and will continue to work diligently and cooperatively <br /> with Costco to facilitate the approval of required permits and entitlements, as well the <br /> construction of the improvements. All Project Improvements will be dedicated to the City or <br /> State,as applicable, upon acceptance of the work by the City or the State. <br /> Section 3.4 Payment for Design and Constniction Costs. All payments for the actual <br /> third-party costs related to the final design and construction of the Project Improvements will be <br /> advanced by Costco. Costco shall be reimbursed for Costco Construction Costs in accordance <br /> with Article 4. <br /> Section 3.5 Payment of JDEDZ Street Improvement Cost Overruns. The City and <br /> Costco will each be responsible to pay fifty percent (50%)of the Cost Overruns. Costco will not <br /> receive any reimbursement for the payment of its portion of Cost Overruns. <br /> Section 3.6 Cost Overruns for Stoneridge Drive and 1-680 Project. The City shall <br /> reimburse Costco for any approved costs related to the Stoneridge Drive and 1-680 Project that <br /> are in excess of Seven Million One Hundred Ten Thousand Dollars($7,110,000) upon <br /> acceptance of the completed Stoneridge Drive and 1-680 Project by the City or the State, as <br /> applicable. <br /> Section 3.7 Costco to Dedicate Costco Site Right of Way. The Costco Right of Way <br /> is currently a portion of the Costco Site. Costco will dedicate the Costco Right of Way to the <br /> City at no cost to the City. <br /> 7 <br /> 1310 01'2218870.K <br /> 2/7/2018 <br />