My WebLink
|
Help
|
About
|
Sign Out
RES 18-999
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2018
>
RES 18-999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 12:39:27 PM
Creation date
2/22/2018 4:37:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/20/2018
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br /> NOW,THEREFORE, in consideration of the foregoing recitals,the mutual covenants contained <br /> in this Agreement, and other good and valuable consideration, the receipt and sufficiency of <br /> which is hereby acknowledged, the Parties agree as follows: <br /> ARTICLE 1. <br /> DEFINITIONS <br /> Section 1.1 Definitions. In addition to the terms defined elsewhere in this Agreement, <br /> the following capitalized words shall have the following meanings: <br /> (a) "Agreement" means this Johnson Drive Economic Development Zone <br /> Transportation Improvement and Cost Allocation Agreement. <br /> (b) "Auditor" is defined in Section 3.10. <br /> (c) "City"is defined in the preamble. <br /> (d) "City Engineer"means the City Engineer or his or her designee. <br /> (e) "Cost Certification" is defined in Section 3.10. <br /> (f) "Costco" is defined in the preamble. <br /> (g) "Costco Acquisition Costs"is defined in Section 3.9. <br /> (h) "Costco Construction Costs"means (i)the actual out of pocket costs paid <br /> by Costco to third parties related to the design and construction of the JDEDZ Street <br /> Improvements, excepting costs to pay Cost Overruns as further specified in this Agreement and <br /> (ii)the actual out of pocket unreimbursed costs, up to Seven Hundred Ten Thousand Dollars <br /> (S710,000),paid by Costco for Stoneridge Drive and 1-680 Project costs that do not constitute <br /> Stoneridge Drive Cost Overruns. <br /> (i) "Costco Contribution Amount" is defined in Section 4.2. <br /> (j) "Costco Reimbursement Amount is defined in Section 4.2. <br /> (k) "Costco Right of Way" means the portion of the Costco Site to be <br /> dedicated to the City to allow for the JDEDZ Street Improvements adjoining the Costco Site <br /> shown on Attachment 5. <br /> (1) "Costco Sales Tax Share"means fbrty percent(40%)of the Sales Tax <br /> generated by Costco at the Costco Site during the Term of this Agreement. <br /> (in) "Costco Site"means the real property at 7200 Johnson Drive. <br /> (n) "Costco Store"means that wholesale and general merchandise store <br /> owned by Costco and located on the Costco Site. <br /> 3 <br /> 1310 01‘.2213870.8 <br /> 2/7/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.