My WebLink
|
Help
|
About
|
Sign Out
RES 18-999
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2018
>
RES 18-999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 12:39:27 PM
Creation date
2/22/2018 4:37:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/20/2018
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agreement which, in turn, will reduce the years it will take the City to reimburse <br /> Costco for the funds Costco has advanced for the Project. <br /> Based on current cost estimates and the funding sources identified above, the <br /> following is a summary of the Project funding: <br /> Proposal to Fund JDEDZ Transportation Improvements <br /> Design&Construction Cost <br /> (Excluding ROW costs not <br /> Required kr Stoneridge Dr&I- <br /> 680 Onramp Proect) $19,970,000 <br /> Right of Way(ROW)Estimate <br /> (Includes Costco ROW) 1,500,000 <br /> Total Project Cost$21,470,000 <br /> Cost Sharing Design and Percent of <br /> Construction Amount Total <br /> Transportation Impact Fee(TIF) <br /> (Stoneridge Drive&I-880 <br /> Onramp Protect only) $6,400,000 30% <br /> City Contribution through Sates <br /> Tax Share•60%to City and 40% <br /> to Costco(Q 1.5%interest 6785,000 34% _ <br /> Costco Cash Contribution` 6,785,000 34% <br /> Total Funding Sources$19,970,000 <br /> Right of Way(ROW)Cost Sharing Proposal <br /> Costco Owned ROW Contributed to prolecl at no charge <br /> Remaining required ROW that is <br /> not donated to the project Shared 50/50 with the City but Costco's portion will be added to <br /> the 56.785,000 sales tax sharing agreement at no interest. <br /> 'Includes Costco 53.7M required TIF contribution that would be converted to a direct cash contribution to the JDEDZ <br /> transportation improvements <br /> Other: <br /> 1.Costco will issue and manage the construction contract for the transportation improvements. <br /> 2.Costco is estimated to be responsible for 44%of total daily trips at tub build out and 78%of the trips in Phase 1. <br /> The City proposes to establish a JDEDZ Transportation fee to charge subsequent JDEDZ development to <br /> reimburse the City for fronting their portion of the costs to implement transportation Improvements. <br /> E. Issuing and Managing Construction Contracts <br /> Costco will act as the Developer on this project issuing and managing design <br /> and construction contracts for the public roadway infrastructure improvements <br /> that are necessary as identified in the JDEDZ DSEIR/FSEIR. The City of <br /> Pleasanton will review and approve design plans as they are developed for <br /> conformance with the JDEDZ DSE1R/FSEIR and City standards. The City of <br /> Pleasanton will inspect infrastructure construction for conformance with design <br /> plans. City will accept all public improvements for maintenance when complete. <br /> Contracts for this Public Works Project will include prevailing wages as required <br /> by law. <br /> The construction improvements consist of several public roadway <br /> improvements outlined in DSEIR/FSEIR and include the following: <br /> 1. Commerce Drive at Johnson Drive Signal (Mitigation 4.D-1a) <br /> 2. Johnson Drive at Owens Drive (North) Signal (Mitigation 4.D-1b) <br /> 10IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.