Laserfiche WebLink
Contractor is to exercise extreme safety measures when working around the public. Care <br /> should be taken to ensure mower speed is appropriate, clippings are not directed toward <br /> public, and mowing within parks is adjusted as needed to best accommodate users, etc. <br /> Upright grasses will be mowed to a uniform height of 3-inches. Mower blades will be <br /> kept sharp so as not to damage the turf or create a"frayed"turf blade. Mulching mowers <br /> are encouraged to be utilized for this work. <br /> Before each mowing cycle the mow pattern will be rotated 45 degrees clockwise from the <br /> previous weeks mow pattern. <br /> Care is to be taken at all times so as to avoid wet, soggy, ground areas. If an area cannot <br /> be mowed due to wet or soggy ground, it is to be avoided and cut with a line trimmer or <br /> other approved lightweight equipment. <br /> Smaller corner areas not accessible with mowers will be cut each week with a line- <br /> trimmer to a uniform height of 3 inches. <br /> Contractor will provide a list of the mowers intended to be utilized on the project to the <br /> Parks Superintendent for approval two weeks before mowing work is scheduled to begin. <br /> The Parks Supervisor holds the final decision regarding the type and size(s) of mower, <br /> and speed at which an area is to be cut. <br /> Contractor's mowers are to be relatively clean and free of noxious weeds and diseases <br /> before entering site each week so as to not transplant these from other sites. <br /> Cut grass clippings will not be left to dry on the turf in"clumps" so large that they shade <br /> the grass. Any clumps left as the result of the mowing operation will be broken-up and <br /> evenly distributed across the turf so as to not shade the grass. If clippings cannot be <br /> broken up and dispersed evenly on site, Contractor will remove the clippings from the <br /> site at Contractor's expense. <br /> All grass clippings, mud, and other debris that is the result of mowing will be removed <br /> from all hardscape areas immediately after the site is mowed. Clippings, mud, and debris <br /> are not to be blown into the streets or gutter nor allowed to collect in drainage ways. <br /> 2. Mowing and Edging Scheduling and Frequency <br /> Work will be performed between 8:00 a.m. and 4:00 p.m. only. The Parks Superintendent <br /> will have the authority to change the hours and days of work to meet the needs of the City <br /> upon notice to Contractor. <br /> Normal turf mowing will only occur between 8:00 am and 4:00 pm only. Weekly <br /> scheduled mowing will occur as follows: Route 1 on Monday, Route 2 on Tuesday, and <br /> Route 3 on Wednesdays. The normal mowing days may be adjusted in advance by the <br /> City due to holidays, events, or weather. Annual mowing frequency will occur <br /> approximately as follows: <br /> Exhibit A <br /> Page 2 of 5 <br />