My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
022018
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 5:05:43 PM
Creation date
2/15/2018 5:05:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/20/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br /> Bi-Annual Hydrant Lateral Replacement <br /> CIP No. 17135 <br /> 02/20/18 <br /> Project Funding to Date Amount <br /> 2017-18 CIP Allocation $ 200,000.00 <br /> TOTAL FUNDING TO DATE $ 200,000.00 <br /> Expenditures/ Encumbrances To Date <br /> Advertising $ 100.00 <br /> Sub-Total Expenditures to Date $ 100.00 <br /> Construction Budget <br /> Northern Underground Construction, Inc. - base bid $ 850,735.00 <br /> Construction Contingency (approximately 15%) $ 127,000.00 <br /> Sub-Total Construction Cost $ 977,735.00 <br /> TOTAL PROJECT BUDGET $ 977,835.00 <br /> Funding Balance/ (Shortfall) <br /> Current Shortfall $ (777,835.00) <br /> Transfers from: <br /> CIP 16127, Bi-Annual Water Tank Corrosion Repairs $ 180,000.00 <br /> CIP 14127, Bi-Annual Water Tank Corrosion Repairs $ 100,000.00 <br /> CIP 11127, Bi-Annual Water Tank Corrosion Repairs $ 100,000.00 <br /> CIP 15146, Ruby Hill - Aditional Water <br /> Storage/Corrosion Repairs $ 220,000.00 <br /> CIP 15147, Water Master Plan Update $ 131,000.00 <br /> CIP 18108, Water Pump and Motor Upsizing $ 46,835.00 <br /> TOTAL TRANSFER $ 777,835.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.