My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
020618
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 9:10:26 AM
Creation date
2/1/2018 9:08:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br /> JOINT FIRE OPERATIONS and ASSIGNED PERSONNEL - COST SHARING PLAN <br /> METHODOLOGY <br /> All joint fire operating costs of LPFD are summarized and categorized into the following <br /> types <br /> • Administrative <br /> • Prevention <br /> ® Suppression <br /> ® Emergency Operations <br /> • Capital Replacement <br /> Administrative <br /> These are costs incurred for the general administration and management of the JPA, <br /> and include salaries, other employment costs, and supplies necessary for the <br /> administration of the JPA Costs categorized as Administrative are shared 50/50 by <br /> both Cities <br /> Prevention <br /> These are costs incurred for development services (plan checking and inspection <br /> services) and include salaries, other employment costs, and supplies Fifty percent of <br /> the costs categorized as Prevention are shared 50/50 by both Cities The other 50% of <br /> these costs are shared proportionally based upon level of service during any given fiscal <br /> year Currently, level of service is measured by number of inspections performed <br /> Suppression <br /> These are costs incurred for suppression services including salaries, other employment <br /> costs, and supplies Costs categorized as suppression will be shared by both Cities <br /> proportionally based upon staffing levels within the suppression function <br /> Emergency Operations <br /> These are costs incurred for the administration and management of the Emergency <br /> Operations function, and include salaries, other employment costs, and supplies Costs <br /> categorized as Emergency Operations are shared 50/50 by both Cities <br /> Capital Replacement <br /> These are costs incurred for the replacement of significant program equipment, such as <br /> SCBA, thermal imaging cameras, and vehicle extraction tools Costs categorized as <br /> Capital Replacement are shared 50/50 by both Cities <br />
The URL can be used to link to this page
Your browser does not support the video tag.