My WebLink
|
Help
|
About
|
Sign Out
09B
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
020618
>
09B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2018 5:22:20 PM
Creation date
1/31/2018 3:20:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
change in the Construction Plans required in order to comply with applicable codes shall be <br />deemed approved, so long as such change does not substantially nor materially change the <br />architecture, design, function, use, or amenities of the Project as shown on the latest approved <br />Construction Plans. Nothing in this Section is intended to or shall be deemed to modify the <br />City's standard plan review procedures. <br />5.9 Rights of Access. For the purpose of ensuring that the construction of the Project <br />is completed in compliance with this Agreement, Developer shall permit representatives of the <br />City to enter upon the Property following 24 hours written notice (except in the case of <br />emergency in which case such notice as may be practical under the circumstances shall be <br />provided). <br />5.10 City Disclaimer. Developer acknowledges that the City is under no obligation, <br />and the City neither undertakes nor assumes any responsibility or duty to Developer or to any <br />third party, to in any manner review, supervise, or inspect the progress of construction or the <br />operation of the Project. Developer and all third parties shall rely entirely upon its or their own <br />supervision and inspection in determining the quality and suitability of the materials and work, <br />the performance of architects, subcontractors, and material suppliers, and all other matters <br />relating to the construction and operation of the Project. Any review or inspection undertaken by <br />the City is solely for the purpose of determining whether Developer is properly discharging its <br />obligations under this Agreement, and shall not be relied upon by Developer or any third party as <br />a warranty or representation by the City as to the quality of the design or construction of the <br />Project or otherwise. <br />5.11 Defects in Plans. The City shall not be responsible to Developer or to any third <br />party for any defect in the Construction Plans or for any structural or other defect in any work <br />done pursuant to the Construction Plans. Developer shall indemnify, defend (with counsel <br />approved by City) and hold harmless the Indemnitees from and against all Claims arising out of, <br />or relating to, or alleged to arise from or relate to defects in the Construction Plans or defects in <br />any work done pursuant to the Construction Plans whether or not any insurance policies shall <br />have been determined to be applicable to any such Claims. Developer's indemnification <br />obligations set forth in this Section shall survive the expiration or earlier termination of this <br />Agreement and the recordation of a Certificate of Completion. It is further agreed that City does <br />not, and shall not, waive any rights against Developer which it may have by reason of this <br />indemnity and hold harmless agreement because of the acceptance by City, or Developer's <br />deposit with City of any of the insurance policies described in this Agreement. Developer's <br />indemnification obligations pursuant to this Section shall not extend to Claims to the extent <br />arising from the gross negligence or willful misconduct of the lndemnitees. <br />5.12 Certificate of Completion for Project. Promptly after completion of construction <br />of the Project, issuance of a final Certificate of Occupancy by the City for all residential units in <br />the Project, and the written request of Developer, the City will provide a certificate substantially <br />in the form attached hereto as Exhibit F ("Certificate of Completion") so certifying, provided <br />that at the time such certificate is requested all applicable work has been completed for the <br />Project. The Certificate of Completion shall be conclusive evidence that Developer has satisfied <br />its obligations regarding the construction of the Project. At Developer's option the Certificate of <br />Completion shall be recorded in the Official Records. The Certificate of Completion shall not <br />OAK #4845-1087-0362 v5 <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.