Laserfiche WebLink
Avenue intersection AM peak would remain generally unchanged at LOS D. The Traffic Impact <br />Analysis was reviewed and approved by the City Council as part of the project and no further <br />traffic analysis was required as part of this proposal. <br />Due to the unique nature of the development and the fact very few, if any, residents drive, staff <br />believes the proposed on-site parking will be sufficient to accommodate the on-site property <br />management, caregivers, support staff, residents, as well as visitors on a daily basis. Leasing <br />or renting of the community building, which has the potential to increase on-site parking and <br />traffic demands, will require a Conditional Use Permit to analyze the full extent of potential <br />traffic and parking impacts. The project narrative and analysis, proposed parking, and on-site <br />operations have been reviewed by the Traffic Division and, overall, staff believes the proposed <br />parking is adequate for the typical daily operations as well as potential gatherings within the <br />community building. <br />Trees and Landscaping <br />The subject site is currently vacant with no trees. The preliminary landscape plan includes a <br />tree/plant palette of native and non-native species that are primarily drought tolerant. New <br />trees and landscaping would be planted along the eastern property line adjacent to the Public <br />Storage site as well as within the setbacks along Nevada Street and Sunflower Hill Way. In <br />addition, screening trees will be planted along the sport court perimeter wall to provide <br />additional screening. There are also several stormwater bioswales that would be planted with <br />low -growing shrubs and ground cover. More details are available in Exhibit B. Overall, staff <br />believes the proposed plant species, quantities, and sizes are adequate. <br />Grading, Drainage, and Storm Water Runoff <br />As mentioned previously, the site is currently vacant and relatively flat, and the proposed <br />project would not substantially change the existing topography. A preliminary grading and <br />drainage plan is included as part of Exhibit B on Sheet C2. The preliminary stormwater <br />management plan is also included and indicates several best -management practices are <br />proposed for purposes of storm water quality control. Bio -retention planters are located along <br />the boundaries of the property. <br />The City Engineering Department has reviewed the preliminary grading and drainage plan and <br />finds it to be generally acceptable. A condition of approval requires the project to meet the <br />requirements of the current Municipal Regional Stormwater National Pollutant Discharge <br />Elimination System (NPDES) Permit. <br />Green Building Measures <br />As required by the City's Green Building Ordinance, new multi -family residential development <br />must achieve 50 points or greater on the multi -family residential Green Building checklist. The <br />applicant has provided a preliminary project checklist outlining the green building measures <br />proposed for the project to achieve 50 points or greater, consistent with the City's ordinance. <br />As conditioned, the final Green Building measures and score will be determined with the <br />review of the building permit application. The project will also need to conform to the State of <br />California's Green Building Standards Code, "CALGreen." <br />Exclusive Negotiating Rights Agreement (ENRA) <br />The City Council approval of Irby Ranch required the dedication of 1.64 acres of land to the <br />City for development of an affordable housing community for individuals with special needs. <br />PUD -129, Sunflower Hill Planning Commission <br />11 of 16 <br />