Laserfiche WebLink
34. Planning Division approval is required before any changes are implemented in site <br />design, grading, building design, building colors or materials, green building measures, <br />landscape material, etc. <br />35. The applicant is encouraged to use best management practices for the use of pesticides <br />and herbicides. <br />36. The applicant must provide to the Director of Community Development a building height <br />certification performed by a licensed land surveyor or civil engineer. Said certification <br />must allow for the installation of finished roof materials and must meet the approved <br />building height. <br />37. The building permit plan check package will be accepted for submittal only after the <br />ordinance approving the PUD development plan becomes effective, unless the project <br />developer submits a signed statement acknowledging that the plan check fees may be <br />forfeited in the event that the ordinance is overturned or that the design is significantly <br />changed. In no case will a building permit be issued prior to the effective date of the <br />ordinance. <br />38. The approved building materials and colors shall be stated on the plans submitted for <br />building permit issuance. <br />39. All demolition and construction activities, inspections, plan checking, material delivery, <br />staff assignment or coordination, etc., shall be limited to the hours of 8 a.m.-5 p.m., <br />Monday through Saturday. No construction shall be allowed on State or Federal <br />Holidays or Sundays. The Director of Community Development may allow earlier <br />"start -times" or later "stop -times" for specific construction activities (e.g., concrete <br />pouring), if it can be demonstrated to the satisfaction of the Director of Community <br />Development that the construction noise and construction traffic noise will not affect <br />nearby residents or businesses. All construction equipment must meet Department of <br />Motor Vehicles (DMV) noise standards and shall be equipped with muffling devices. <br />Prior to construction, the applicant shall post on the site the allowable hours of <br />construction activity. <br />40. All excess soil from the site shall be off -hauled from the site and disposed of in a lawful <br />manner. No temporary stockpiling of dirt on this site shall occur without specific review <br />and approval by the Planning Division. <br />41. Campers, trailers, motor homes, or any other similar vehicle are not allowed on the <br />construction site except when needed as sleeping quarters for a security guard. <br />42. A construction trailer shall be allowed to be placed on the project site for daily <br />administration/coordination purposes during the construction period. <br />43. Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor. <br />Page 6 of 16 <br />