My WebLink
|
Help
|
About
|
Sign Out
09A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
020618
>
09A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2018 5:19:12 PM
Creation date
1/31/2018 3:10:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUD -129 <br />Exhibit A, Conditions of Approval <br />Sunflower Hill <br />February 6, 2018 <br />PROJECT SPECIFIC CONDITIONS <br />Planning Division <br />1. The permitted uses for the property shall include multi -family residential, community <br />center, and a leasing office with support services/facilities for the multi -family <br />development as shown on the development plan. Renting or leasing of the community <br />building including additional incidental uses within the building shall require a Conditional <br />Use Permit. <br />2. Should parking availability become an issue as determined by the Director of Community <br />Development, the applicant shall resolve/improve any issues within 90 days of being <br />notified by the City by submitting a Parking Management Plan for Community <br />Development Department review and approval. <br />3. All exterior lighting including landscape lighting shall be directed downward and <br />designed or shielded so as to not shine onto neighboring properties or streets. The <br />project/building developer shall submit a final lighting plan including photometrics and <br />drawings and/or manufacturer's specification sheets showing the size and types of light <br />fixtures. The lighting plan shall be subject to the review and approval by the Director of <br />Community Development prior to building permit issuance. <br />4. Wood-, fiberglass-, or vinyl-framed/sashed windows shall be utilized on the structures. If <br />fiberglass- or vinyl-framed/sashed windows are used, they shall have a similar frame <br />and sash thickness as found on a traditional wood-framed/sashed window. In addition, <br />simulated mullions must appear real and be on both sides of the glass. Manufacturer's <br />specification sheets, details, and sections of the windows, and window treatments (sills, <br />trim, etc.) shall be shown on the building permit plans and shall be subject to review and <br />approval by the Director of Community Development prior to building permit issuance. <br />5. The elevator shaft tower on the residential building shall include a standing seam metal <br />roof to match the tower feature on the community building. <br />6. Final color and material samples shall be submitted to the Director of Community <br />Development for review and approval prior to issuance of the first building permit. <br />7 The final design of the multi -use sport court sound wall shall be reviewed and approved <br />by the Director of Community Development prior to building permit issuance. Design <br />considerations for the wall may include a decorative mural, improved landscaping, or <br />enhanced finished materials on the perimeter wall such as stucco or siding. <br />8. No signage is part of this approval. Prior to installation of any signage, an application <br />shall be submitted for Sign Design Review. <br />Page 1 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.