Laserfiche WebLink
BACKGROUND <br /> On December 20, 2016, Council awarded the contract to the lowest responsible bidder, <br /> Murphy Industrial Coatings, Inc. in the amount of$1,122,150. In addition, the City <br /> Council awarded a contract to Swinerton Management & Consulting (SMC) and Biggs <br /> Cardosa Associates, Inc. (BCA) to provide construction support services. <br /> DISCUSSION <br /> The project consisted of cleaning and painting all steel surfaces of the existing bridge, <br /> bridge guardrail, walkway, walkway handrail, water line and 4-inch gas line casing, <br /> including utility straps and supports. The existing paint contained lead and was peeling <br /> away from the bridge structure. A single lane of traffic was controlled by temporary <br /> traffic signals during construction. The project is complete and the bridge is open for <br /> use. Staff recommends acceptance of the project. <br /> Budget <br /> Project expenditures total $1,369,579 include the design, construction contract, change <br /> orders and consultant support services as outlined in Attachment 1. The final <br /> construction contract cost, including $20,428 in change orders, is $1,142,578. The <br /> majority of the change orders were associated with additional traffic control and <br /> additional work required of the City contractor by PG&E in order to work near the PG&E <br /> power lines. <br /> The project was funded by a federal grant through the Bridge Preventative Maintenance <br /> Program administered by Caltrans in which 88.53% of eligible project costs are <br /> reimbursable. The cost of design totaled $126,046 and the cost of construction totaled <br /> $1,243,533. The total anticipated reimbursement from the Federal grant is $1,212,488 <br /> with a local match of$157,091. Once the final invoices are paid, staff will complete the <br /> application for the grant reimbursement. <br /> SMC was awarded a task authorization under the City's on-call contract for $148,995 to <br /> provide a full-time inspector for the project. The inspection services are complete; <br /> however, SMC continues to work on the final Caltrans paperwork for the project <br /> closeout. As of November 2017, SMC has expended $90,975 and the total anticipated <br /> expenditures are $92,975 as it is anticipated that SMC will bill an additional $2,000 for <br /> project closeout work. Staff recommends leaving $2,000 in the project balance in order <br /> to pay for the remaining invoices. Upon payment of the final invoice, the remaining <br /> funds will be transferred to the fund balance. <br /> BCA was awarded a task authorization under the City's on-call contract for$13,900 to <br /> provide construction support services and shop drawing reviews. The work under the <br /> task authorization is complete; BCA has expended $7,491. <br /> Page 2 of 3 <br />