My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
011618
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2018 4:28:13 PM
Creation date
1/10/2018 4:28:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/16/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION <br /> This 2018 CIP project begins the process of upgrading the 400+ traffic signal cameras <br /> to provide the ability to differentiate between the presence of a vehicle and the presence <br /> of a bicycle. <br /> This video detection equipment will replace older malfunctioning equipment and will <br /> provide bicycle discrimination allowing for timing to be adjusted in real-time to <br /> accommodate the longer crossing time for bicycles. These 28 new cameras will be <br /> placed at the Stanley at Valley/Bernal intersection as well as other high volume bicycle <br /> network locations. <br /> A Request for Proposals was posted on the City website in conformance with section <br /> 3.7 of the City's Purchasing Policy. One bid was received from Econolite. Econolite is <br /> our current provider of signal detection equipment and these new cameras are <br /> compatible with our existing software system that is used to operate and maintain the <br /> other 400+ Econolite cameras installed in the City. Although the City only received one <br /> bid for this project, the camera cost is similar to bids we have received in the past when <br /> multiple bids were received for camera replacement projects. <br /> The remaining cameras will be upgraded through our capital replacement plan over the <br /> next ten years. <br /> Submitted by: Fiscal eview: Technol•gy Review: Approved y: <br /> NAt \ <br /> erry Beaudin Tina Olson All-,.4; mond' Nelson Fialho <br /> Director of Director of Director of City Manager <br /> Community Finance Information <br /> Development Technology <br /> Attachments <br /> 1. Purchase Order with Econolite proposal <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.