Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Mitigation Measures/Improvement Measures <br />S -NO -1.1 Repave Stoneridge Drive between Kamp Drive and Trevor <br />Parkway with noise -attenuating pavement and replace sound wall nearest <br />the Stoneridge Drive bridge Prior to the completion of the Stoneridge <br />Drive extension to El Charro Road, Stoneridge Drive between Kamp <br />Drive and Trevor Parkway shall be repaved with noise -attenuating <br />pavement and the sound wall closest to the, south side of the Stoneridge <br />Drive bridge. (adjacent to the Maria/Curry Street residences) shall be <br />replaced with a wall approximately one foot higher or, if the residents do <br />not want their wall replaced, by constructing a new, higher wall on City <br />right of way in front of the existing wall. <br />Population and Housing <br />PH -1.1 Deleted per. FEIR. The Development Agreement for the Project <br />will establish the phasing requirements for the senior continuing care <br />community. See FEIR, pages 4-21, 4-22. <br />Transportation <br />TR -1.1 Deleted —Per FEIR, at page 3-22. Impact less than significant with <br />extension of Stoneridge Drive. <br />Monitoring Action <br />Verify that Stoneridge <br />Drive between Kamp <br />and Trevor is repaved <br />with noise -attenuating <br />pavement and that the <br />sound wall adjacent to <br />the two homes on <br />Maria/Curry closest to <br />the bridge is replaced <br />with a wall one foot <br />higher than the existing <br />wall. <br />Responsibility"u""I'v <br />Field inspections:' City <br />of Pleasanton <br />Engineering Division. <br />Payment of funds for <br />the repaving: Project <br />Sponsor to the <br />maximum amount <br />($1.5 million) as set <br />forth in the Specific <br />Plan Amendment; any <br />amount above that, the <br />City of Pleasanton. <br />Implementation: <br />Project Sponsor for <br />the construction of the <br />sound wall; the City of <br />Pleasanton for the <br />repaving. <br />Field inspections: <br />City of Pleasanton <br />Engineering Division. <br />Date Completed/ <br />Timing Signature <br />Prior to Signature <br />completion of <br />Stoneridge Drive Title <br />extension to El <br />Charro Road. Date <br />TR -.1.2 Improve Hopyard Road at Owens Drive (#10). To reduce project -Verify payment of I ,Payment of fee: I Prior to issuance <br />traffic development fee. Project Developers of building Signature <br />31 <br />