Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT/STAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility""""I'v <br />Timing <br />Signature <br />limited to the hours of 8:00 a.m. to 5:00 p.m., Monday <br />through Saturday. In addition, no construction shall be <br />allowed on State and federal holidays. If complaints are <br />received regarding the Saturday construction hours, the <br />Community Development Director may modify or revoke <br />the Saturday construction hours. The Community <br />Development Director may allow earlier "start -times" for <br />specific construction activities (e.g., concrete- <br />foundation/floor pouring), if it can be demonstrated to the <br />satisfaction of the Community Development Director that <br />the construction and construction traffic noise will not affect <br />nearby residents. <br />d. All construction equipment must meet DMV noise standards <br />and shall be equipped with muffling devices. <br />e. Designate a noise disturbance coordinator who will be <br />responsible for responding to complaints about noise during <br />construction. The telephone number of the noise <br />disturbance coordinator shall be conspicuously posted at the <br />construction site and shall be provided to the City of - <br />Pleasanton. Copies of the construction schedule shall also <br />be posted at nearby noise -sensitive areas. <br />NO -4.1 Provide noise attenuating pavement to new portions of Stoneridge <br />Verify that noise <br />Verification: City of <br />During <br />Signature <br />Drive. The project sponsor shall be required to provide noise attenuation <br />attenuating pavement is <br />Pleasanton <br />construction of <br />used for the new <br />Engineering Division. <br />Stoneridge Drive. <br />Title <br />on the new portions of Stoneridge Drive. Noise attenuation shall be <br />portions of Stoneridge <br />achieved with the implementation of open grade asphalt, which provides <br />Drive; field inspections. <br />Implementation: <br />Date <br />approximately a 3 dBA decrease in traffic noise level, in order to reduce <br />Project Sponsor. <br />the project's contribution to traffic noise in this area and to comply with <br />the City's 60 dBA CNEL noise standard for residential land uses. <br />Endnote #5 applies. <br />30 <br />