Laserfiche WebLink
b. The public sanitary line main will be a minimum of 8 inches in diameter unless <br />otherwise approved by the City Engineer. <br />c. All water and sewer lines will be separated by a minimum of 10 feet unless <br />otherwise approved by the City Engineer. <br />d. There will be an attempt to achieve a public sanitary sewer pipe slope of <br />0.005 (0.5%) with a velocity of 2.0% per second. A slope of 0.003 (0.3%) is <br />acceptable, if necessary, to meet site conditions. <br />e. There will be an attempt to achieve a gutter slope of 0.75%. <br />Utilities to be owned and maintained by the City will be located in a public <br />right of way or PSE with sufficient access for maintenance. The location and <br />width of a PSE will be subject to the review and approval of the City Engineer <br />prior to the recordation of a Final Map for the PUD project site or issuance of <br />a building permit, whichever occurs first. <br />g. A sanitary sewer sampling manhole will be provided on any new sanitary <br />sewer lateral from a building with a commercial use, unless otherwise <br />determined by the City Engineer unless otherwise approved by the City <br />Engineer. <br />h. Prior to the issuance of a building permit, a typical street section will be <br />shown on the plans for each street showing how the utilities (public water, <br />public sewer, storm drain, private water and sanitary sewer, fire mains, <br />irrigation mains and joint trench [PG&E, AT&T, & Comcast]) will be placed <br />under the street with the required clearance between the pipes. The plans <br />will be subject to the review and approval of the City Engineer. <br />Prior to the issuance of a building permit, a joint trench plan (PG&E, AT&T, & <br />Comcast) including splice box, switch box and transformer locations will be <br />prepared and included in the plan set. All utility boxes and utilities for PG&E, <br />AT&T, Comcast and similar utility companies will be installed underground. <br />Stormwater treatment will be required for all roof drainage. <br />6. Urban Stormwater Runoff Requirements. <br />a. All on site stormwater will be treated on site before entering the stormwater <br />flow control basin in the Neighborhood Park. <br />b. A storm drain sampling manhole will be provided, unless otherwise <br />determined by the City Engineer unless otherwise approved by the City <br />Engineer. <br />5 <br />