My WebLink
|
Help
|
About
|
Sign Out
PC-2009-40, PUD-70, SAN JOSE ARENA MANAGEMENT
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2009
>
PC-2009-40, PUD-70, SAN JOSE ARENA MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 3:43:06 PM
Creation date
12/28/2017 3:37:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/5/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2009-40
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to stormwater runoff pollution. <br />d. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep the <br />street pavement adjoining the project site on a daily basis. Scrape caked on <br />mud and dirt from these areas before sweeping. <br />e. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace filter <br />materials to ensure effectiveness and to prevent street flooding. <br />f. Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br />g. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. <br />h. Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br />27. Stormwater Operation Requirements. All projects, unless otherwise <br />determined by the City Engineer or Chief Building Official, shall enter into a <br />recorded Stormwater Treatment Measures Inspection and Maintenance <br />Agreement for ongoing maintenance and reporting of required stormwater <br />measures. These measures may include, but are not limited to: <br />a. A mechanism shall be created, such as a property owners' association, to be <br />responsible for maintaining all private streets, private utilities and other <br />privately owned common areas and facilities on the site including stormwater <br />treatment measures. These maintenance responsibilities shall include <br />implementing the maintenance plan, which is attached to the Stormwater <br />Treatment Measures Inspection and Maintenance Agreement. This <br />document shall be reviewed by the City Attorney's Office and recorded with <br />the final map. <br />b. The storm drain inlets clearly marked and maintained with the words "No <br />Dumping — Drains to Bay." <br />OP, <br />
The URL can be used to link to this page
Your browser does not support the video tag.