Laserfiche WebLink
mitigation measures identified for the Ice Center Alternative would <br />reduce impacts associated with construction activities to less than <br />significant, similar to the Ice Center Alternative. <br />Population, Employment, Housing <br />A minor increase in size of the Ice Center by approximately 3,000 <br />square feet would not create a substantially more severe impact <br />than shown in the EIR since the number of employees at the Ice <br />Center is not proposed to change from what was analyzed. <br />Water Supply <br />The number of occupants is not proposed to change. The impacts <br />to water supply would be similar to those analyzed in the Ice Center <br />Alternative. This alternative resulted in a less than significant <br />impact on water supply. <br />iii. Mitigation measures or alternatives previously found not to be <br />feasible would in fact be feasible, and would substantially reduce <br />one or more significant effects of the project, but the project <br />proponents decline to adopt the mitigation measure or alternative; <br />or-.,, <br />6iscussion: The increase in size of the Ice Center will not make the <br />proposed mitigation measures or other alternatives previously <br />identified as infeasible to be feasible, and will not <br />VNsubstantially reduce one or more of the significant effects of the <br />project for the reasons described above. <br />iv. Mitigation measures or alternatives which are considerably different <br />from those analyzed in the EIR would substantially reduce one or <br />more significant effects on the environment, but the project <br />proponents decline to adopt the mitigation measure or alternative. <br />Discussion: The increase in the size of the Ice Center will not result <br />in mitigation measures or alternatives that are considerably <br />different from those analyzed in the EIR or that will substantially <br />reduce one or more significant effects on the environment for the <br />reasons described above. <br />Conclusion <br />This Addendum to the EIR has been prepared in accordance with CEQA Guidelines, <br />Section 15164, and reflects a proposed increase in size of the Ice Center by <br />approximately 3,179 square feet. Responses to the criteria above do not result in the <br />need to prepare a Subsequent or Supplemental EIR pursuant to CEQA Guidelines <br />Section 15162 and 15163. Therefore, the proposed project is adequately addressed in <br />the EIR and this Addendum. <br />W A -�L � <br />t A -ca u c <br />