Laserfiche WebLink
for ensuring that the contractor is aware of and implements such <br />measures. <br />b. All cut and fill slopes shall be revegetated and stabilized after <br />completion of grading, but in no case later than October 15. <br />Hydroseeding shall be accomplished before September 15 and <br />irrigated with a temporary irrigation system to ensure that the grasses <br />are established before October 15. No grading shall occur between <br />October 15 and April 15 unless approved erosion control/stormwater <br />quality measures are in place, subject to the approval of City <br />Engineer/Chief Building Official. Such measures shall be maintained <br />until such time as permanent landscaping is place. <br />C. Gather all construction debris on a regular basis and place it in a <br />dumpster or other container which is emptied or removed on a weekly <br />basis. When appropriate, use tarps on the ground to collect fallen <br />debris or splatters that could contribute to stormwater runoff pollution. <br />d. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br />street pavement and storm drains adjoining the site. Limit construction <br />access routes onto the site and place gravel on them. Do not drive <br />vehicles and equipment off paved or graveled areas during wet <br />weather. Broom sweep the street pavement adjoining the project site <br />on a daily basis. Scrape caked on mud and dirt from these areas <br />before sweeping. <br />e. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br />drain inlet nearest the downstream side of the project site in order to <br />retain any debris or dirt flowing in the storm drain system. Maintain <br />and/or replace filter materials to ensure effectiveness and to prevent <br />street flooding. <br />f. Create a contained and covered area on the site for the storage of <br />bags, cement, paints, oils, fertilizers, pesticides, or other materials <br />used on the site that have the potential of being discharged into the <br />storm drain system through being windblown or in the event of a <br />material spill. <br />g. Never clean machinery, equipment, tools, brushes, or rinse containers <br />into a street, gutter, or storm drain. <br />h. Ensure that concrete/gunite supply trucks or concrete/plaster <br />operations do not discharge wash water into street, gutters, or storm <br />drains. <br />