These measures shall be incorporated into the construction documents <br />describing procedures and specifications for contractors to follow: <br />• Water all active construction areas at least twice daily. <br />• Cover all trucks hauling soil, sand, and other loose materials to or <br />from the Project Area or require all trucks to maintain at least two <br />feet of freeboard. <br />• Pave, apply water three times daily, or apply (non-toxic) soil <br />stabilizers on all unpaved access roads, parking areas and staging <br />areas at construction sites. <br />• Sweep daily (with water sweepers) all paved access roads, parking <br />areas and staging areas at construction sites. <br />• Sweep streets daily (with water sweepers) if visible soil material is <br />carried onto adjacent public streets. <br />• Hydroseed or apply (non-toxic) soil stabilizers to inactive <br />construction areas (previously graded areas inactive for ten days or <br />more). <br />• Enclose, cover, water twice daily or apply (non-toxic) soil binders to <br />exposed stockpiles (dirt, sand, etc.). <br />• Limit traffic speeds on unpaved roads to 15 mph. <br />• Install sandbags or other erosion control measures to prevent silt <br />runoff to public roadways. <br />• Replant vegetation in disturbed areas as quickly as possible. <br />• Suspend excavation and grading activities to the extent feasible <br />when instantaneous wind gusts exceed 25 mph. <br />• Limit, to the extent feasible, the number of areas adjacent to <br />residences subject to excavation, grading and other construction <br />activity at any one time. <br />9. Underground Service Alert. Prior to initiation of any on-site construction <br />activities, the project developer shall contact the Underground Service Alert <br />(USA) whose purpose is to receive planned excavation reports from public <br />and private excavators and to transmit those planned excavation reports to <br />all participating members of USA who may have underground facilities at <br />the location of excavation. The USA will contact local utilities and inform <br />them that construction is about to begin in their service area. This notice <br />allows local utilities to mark the areas where their underground facilities are <br />located near the construction site so that they may be avoided during <br />project construction. <br />10. PG&E Gas Line. Prior to construction activities within 50 feet of the PG&E <br />gas line, the project contractor shall identify and demarcate the location of <br />the natural gas pipeline using highly visible markers that will remain in place <br />throughout project construction in the vicinity of the pipeline and ensure that <br />all construction workers are aware of the location of the line. The location of <br />the pipeline shall be noted on the site and construction plans. Further, the <br />12 <br />